My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008290 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0850 Old Crystal Bay Road South - 09-117-23-12-0005
>
Septic
>
1996-008290 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:18:01 PM
Creation date
4/2/2018 12:43:17 PM
Metadata
Fields
Template:
x Address Old
Address
0850 Old Crystal Bay Rd S
Document Type
Septic
PIN
0911723120005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eal, o/d2Le,,J <br /> • <br /> ' STING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> EVISED 8-6-96 <br /> April-2 , 95 <br /> Melamed - Lauer Partners <br /> F - • Preserve `‘" '`' <br /> of 1 PVC" <br /> ono enn. Co. MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1, four <br /> bedroom home Designed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances. <br /> The soils on this site are a clay loam. A seasonally high water <br /> table was located at 12" to 32" , (mottled soil) . Due to the <br /> seasonally high water table, a Pressurized Mound System will <br /> need to be installed. The bottom ofthe rock bed must be <br /> located at least 3 ' above the seasonally high water table. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 10.6 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and supply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod, be sure not to over work. <br /> The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure. A warning device <br /> must be installed with a light and sound device, this is in case of <br /> a pump failure. <br /> All neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before <br /> and after construction. The treatment area should be marked off <br /> before construction. This Design is not valid & the system will <br /> need to be relocated if failure to protect the areas proposed <br /> for On-Site Sewage Treatment occurs . <br /> CONT' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.