Laserfiche WebLink
1it <br /> • <br /> O,� , 4 di CITY OF ORONO <br /> ISO gn `' '� "' SEPTIC SYSTEM APPROVAL <br /> ,, l',',.," <br /> CITY of ORONO <br /> � L <br /> 0:14. <br /> , i` Municipal Offices <br /> tiPost Office Box 66 <br /> �� V411nil <br /> G Crystal Bay,Minnesota 55323-0066 <br /> kES8d4; <br /> LOCATION: 850 Old Crystal Bay Rd. S . <br /> OWNER: Melamed <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> April 24, 1995, Revised <br /> SITE EVALUATOR: S—P Testing REPORT DATE: August 6, 1996 <br /> The City of Orono has Approved your on-site system design as of August 22, 1996 <br /> (approved-disapproved) (date) <br /> with the following comments: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORO 0 <br /> ,:yBy j <br /> �/%��--- <br /> Stephen eckman, On-site Systems Manager <br /> ^` TELEPI IONNE-473-7357• FAX-473-0510 <br />