Laserfiche WebLink
Lindstrom Cleaning& Construction,Inc <br /> 9621 10th Avenie North <br /> Plymouth,Mn. 5441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-0847540 <br /> I JUDY_&_GEORGE_REVISE <br /> Main Level <br /> Living Room/Entry IHeight:8' <br /> Missing Wall-Goes to Floor 2'6"X 6'8" Opens into HALLWAY <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 1. General Demolition-per hour 1.00 HR @ 44.79= 44.79 <br /> cutting back plaster and lathe for clean edge for drywall <br /> 2. Mask per square foot for drywall or plaster work 139.56 SF @ 0.16= 22.33 <br /> 3. 5/8"-drywall per LF-up to 2'(tall 12.00 LF @ 7.26= 87.12 <br /> 4. ELECTRICAL 1 1.00 EA @ ELECTRICAL <br /> Refeed and replace 2 receptacles on gutted wall.Refeed telephone jack <br /> 5. Casing-2 1/4" I 31.00 LF @ 1.72= 53.32 <br /> 6. Baseboard-5 1/4" 23.00 LF @ 8.08= 185.84 <br /> Adjusted"Market Conditions"an additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custom)milling. <br /> 7. Seal&paint casing-two coats I 31.00 LF @ 1.21 = 37.51 <br /> 8. Paint door/window trim&jamb- 1 coat(per side) 2.00 EA @ 17.09= 34.18 <br /> 9. Paint door slab only- I coat(p side) 1.00 EA @ 19.97= 19.97 <br /> 10. Seal&paint baseboard,oversi ed-two coats 23.00 LF @ 1.29= 29.67 <br /> 11. Paint baseboard,oversized-o e coat 45.00 LF @ 0.84= 37.80 <br /> 12. Painter-per hour 0.50 HR @ 60.00= 30.00 <br /> labor to cut around all trim with br.ish <br /> 13. Seal the surface area w/latex based stain blocker-one coat 24.00 SF @ 0.50= 12.00 <br /> new drywall <br /> 14. Paint the walls-one coat 363.33 SF @ 0.54= 196.20 <br /> 15. Sand and seal wood floor 139.56 SF @ 3.02= 421.47 <br /> 16. Add for dustless floor sanding . 139.56 SF @ 1.00= 139.56 <br /> 17. Carpet pad-Premium grade 139.56 SF @ 1.13= 157.70 <br /> 18. Carpet pad-Premium grade 139.56 SF @ -1.13= -157.70 <br /> 19. Carpet-Premium grade 165.25 SF @ 5.40= 892.35 <br /> 20. Carpet-Premium grade 165.25 SF @ -5.40= -89235 <br /> 21. Additional labor cost for Berber or patterned carpets 139.56 SF @ 0.22= 30.70 <br /> 22. Additional labor cost for Berber or patterned carpets 139.56 SF @ -0.22= -30.70 <br /> 23. Final cleaning-construction-Residential 139.56 SF @ 0.18= 25.12 <br /> I <br /> Bedroom I Height:8' <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 24. Detach&Reset Light fixture 2.00 EA @ 50.15= 100.30 <br /> JUDY_&_GEOIGE_REVISE 8/11/2016 Page: 5 <br />