My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01006 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Permits/Inspections
>
2016-01006 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:27 PM
Creation date
3/26/2018 3:17:02 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lindstrom Cleaning& Construction,Inc <br /> 9621 10th Avenue North <br /> Plymouth,Mn.35441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-0847540 <br /> CONTINUED-Bedroom <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> wall lamps detached for wallpaper removal and replacement <br /> 25. Window drapery-hardware-(Detach&reset 2.00 EA @ 32.81 = 65.62 <br /> 26. R&R Wallpaper 370.67 SF @ 2.58= 956.33 <br /> 27. R&R Wallpaper 370.67 SF @ -2.58= -956.33 <br /> 28. Prep wall for wallpaper 370.67 SF @ 0.43= 159.39 <br /> 29. Prep wall for wallpaper ' 370.67 SF @ -0.43= -159.39 <br /> 30. General Demolition-per hour 1.00 HR @ 44.79= 44.79 <br /> cutting back plaster and lathe for clean edge for drywall <br /> 31. Mask per square foot for drywiill or plaster work 114.23 SF @ 0.16= 18.28 <br /> 32. 5/8"-drywall per LF-up to tall 7.00 LF @ 7.26= 50.82 <br /> 33. ELECTRICAL 1.00 EA @ ELECTRICAL <br /> refeed one receptacle <br /> 34. Painter-per hour 0.50 HR @ 60.00= 30.00 <br /> labor to cut around all trim with brash <br /> 35. Seal the surface area w/latex b4sed stain blocker-one coat 24.00 SF @ 0.50= 12.00 <br /> new plaster <br /> 36. Casing-2 1/4" 27.00 LF @ 1.72= 46.44 <br /> 37. Baseboard-5 1/4" 8.00 LF @ 8.08= 64.64 <br /> Adjusted"Market Conditions"an additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custom milling. <br /> 38. Seal&paint casing-two coats. 27.00 LF @ 1.21 = 32.67 <br /> 39. Paint door/window trim&jamb- 1 coat(per side) 3.00 EA @ 17.09= 51.27 <br /> 40. Paint door slab only- 1 coat(per side) 3.00 EA @ 19.97= 59.91 <br /> 41. Seal&paint baseboard,oversized-two coats 8.00 LF @ 1.29= 10.32 <br /> 42. Paint baseboard,oversized-one coat 46.33 LF @ 0.84= 38.92 <br /> 43. Sand and seal wood floor I 114.23 SF @ 3.02= 344.97 <br /> 44. Add for dustless floor sanding 114.23 SF @ 1.00= 114.23 <br /> 45. Carpet pad-Premium grade 114.23 SF @ 1.13= 129.08 <br /> 46. Carpet pad-Premium grade 114.23 SF @ -1.13= -129.08 <br /> 47. Carpet-Premium grade 137.17 SF @ 5.40= 740.72 <br /> 48. Carpet-Premium grade 137.17 SF @ -5.40= -740.72 <br /> 49. Additional labor cost for Berber Or patterned carpets 114.23 SF @ 0.22= 25.13 <br /> 50. Additional labor cost for Berber or patterned carpets 114.23 SF @ -0.22= -25.13 <br /> 51. Final cleaning-construction-Residential 114.23 SF @ 0.18= 20.56 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page: 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.