My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01006 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Permits/Inspections
>
2016-01006 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:27 PM
Creation date
3/26/2018 3:17:02 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lindstrom leaning& Construction,Inc <br /> 9621 10th Avenue North <br /> Plymouth,Mn.55441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-0847540 <br /> CONTINUED-Kitchen/Laundry Room <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> labor to cut around all trim with bush,and to cut in wall line when painting ceiling <br /> 101. Mask and cover light fixture 1.00 EA @ 11.62= 11.62 <br /> 102. Seal the surface area w/latex based stain blocker-one coat 124.00 SF @ 0.50= 62.00 <br /> new drywall <br /> 103. Paint the walls and ceiling- o coats 403.81 SF @ 0.79= 319.01 <br /> 104. Sheathing-plywood-3/4" DX 96.47 SF @ 1.98= 191.01 <br /> 105. Linoleum floor covering(sh et goods) 142.67 SF @ 7.85= 1,119.96 <br /> 106. Cabinetry-lower(base)unit 5.50 LF @ 160.81 = 884.46 <br /> North side base cabinet damaged fiom water and demolition <br /> 107. Cabinetry-lower(base)units 5.50 LF @ -160.81= -884.46 <br /> North side base cabinet damaged fi om water and demolition <br /> 108. (Install)Countertop-post formed plastic laminate-Reset 5.50 LF @ 9.21 = 50.66 <br /> North side cabinet counter top 1 <br /> 109. (Install)Countertop-post 1�jormed plastic laminate-Reset 5.50 LF @ -9.21 = -50.66 <br /> North side cabinet counter top <br /> 110. (Install)Cabinetry-lower(bse)units-Reset 9.00 LF @ 34.37= 309.33 <br /> South side cabinets <br /> 111. (Install)Cabinetry-lower(base)units-Reset 9.00 LF @ -34.37= -309.33 <br /> South side cabinets <br /> 112. Countertop-flat laid plastic liminate 9.00 LF @ 37.67= 339.03 <br /> Southside cabinet counter top <br /> 113. Countertop-flat laid plastic laminate 9.00 LF @ -37.67= -339.03 <br /> Southside cabinet counter top <br /> 114. R&R 6"backsplash for flat laid countertop 9.00 LF @ 12.60= 113.40 <br /> 115. R&R 6" backsplash for flat laid countertop 9.00 LF @ -12.60= -113.40 <br /> 116. Backsplash-plastic laminate 6.00 SF @ 6.19= 37.14 <br /> There is an additional 3'x 2'area of backsplash on wall above the 6"strip at the end of the cabinets that was removed <br /> 117. Backsplash-plastic laminate 6.00 SF @ -6.19= -37.14 <br /> There is an additional 3'x 2'area of backsplash on wall above the 6"strip at the end of the cabinets that was removed <br /> 118. Paint cabinetry-lower-faces only 9.00 LF @ 13.48= 121.32 <br /> 9'bank of lower cabinets on South side of room <br /> 119. Paint cabinetry-lower-faces only 9.00 LF @ -13.48= -121.32 <br /> 9'bank of lower cabinets on South side of room <br /> 120. Cabinetry-upper(wall)unis-Detach&reset 5.75 LF @ 49.03= 281.92 <br /> detach only-remove all upper cabir.ets <br /> 121. Detach&Reset Shelving-12"-in place 9.00 LF @ 7.01= 63.09 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page:9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.