Laserfiche WebLink
Lindstrom Cleaning& Construction,Inc <br /> 9621 10th Ave*North <br /> Plymouth,Mn. 5441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-08417540 <br /> CONTINUED-closet <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 78. Baseboard-5 1/4" 8.33 LF @ 8.08= 67.31 <br /> Adjusted"Market Conditions"an additional$4.30,as baseboards need to be custom milled to match up to existing.$4.30/LF is the <br /> additional material cost for custo milling. <br /> 79. Seal&paint casing-two co is 14.00 LF @ 1.21 = 16.94 <br /> 80. Paint door/window trim&ja b- 1 coat(per side) 1.00 EA @ 17.09= 17.09 <br /> 81. Paint door slab only- 1 coat per side) 1.00 EA @ 19.97= 19.97 <br /> 82. Seal&paint baseboard,over ized-two coats 8.33 LF @ 1.29= 10.75 <br /> 83. Detach&Reset Closet shelf nd rod package 3.50 LF @ 9.10= 31.85 <br /> 84. Seal the surface area w/latex ased stain blocker-one coat 17.00 SF @ 0.50= 8.50 <br /> new drywall <br /> 85. Paint the walls-one coat 86.67 SF @ 0.54= 46.80 <br /> 86. Sand and seal wood floor 6.83 SF @ 3.02= 20.63 <br /> 87. Add for dustless floor sanding 6.83 SF @ 1.00= 6.83 <br /> 88. Carpet pad-Premium grade 6.83 SF @ 1.13= 7.72 <br /> 89. Carpet pad-Premium grade 6.83 SF @ -1.13= -7.72 <br /> 90. Carpet-Premium grade 24.67 SF @ 5.40= 133.22 <br /> 91. Carpet-Premium grade 24.67 SF @ -5.40= -133.22 <br /> 92. Additional labor cost for Berber or patterned carpets 6.83 SF @ 0.22= 1.50 <br /> 93. Additional labor cost for Berber or patterned carpets 6.83 SF @ -0.22= -1.50 <br /> 94. Final cleaning-construction-Residential 6.83 SF @ 0.18= 1.23 <br /> Kitchen/Laundry Room Height:8' <br /> Missing Wall-Goes to Floor 2'6" X 6'8" Opens into HALLWAY <br /> DESCRIPTION QTY UNIT PRICE TOTAL <br /> 95. Mask per square foot for drywall or plaster work 96.47 SF @ 0.16= 15.44 <br /> 96. Drywall tape joint/repair-pet LF 16.00 LF @ 5.58= 89.28 <br /> 97. R&R Batt insulation-4"-R13-paper faced 16.00 SF @ 0.86= 13.76 <br /> Exterior Wall <br /> 98. 5/8"-drywall per LF-up to 2'tall 38.00 LF @ 7.26= 275.88 <br /> 2'tall around entire room <br /> 99. ELECTRICAL 1.00 EA @ ELECTRICAL <br /> Install 20 amp receptacle for wasl''er and dryer,refeed and replace three receptacles,replace timer <br /> 100. Painter-per hour 1.00 HR @ 60.00= 60.00 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page: 8 <br />