My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006290 - replace septic
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Septic
>
1994-006290 - replace septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:25 PM
Creation date
3/26/2018 3:15:29 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Septic
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> . . <br /> Design irements October 8, 1992 <br /> L___ • <br /> Considering the soils data and minimum design requirements <br /> of the Septic System Ordinance, our proposal is as follows: <br /> uws: <br /> Construct a Mound System based on a water usage of 600 <br /> gallons per day, fe.rI 4 Bedroom Type I . <br /> 6*^ gpd x . 83 sq. ft . pgpd = 498 sq. feet bed <br /> area-minimum design size <br /> Proposed Design Size 10 x 50 bed = 500 sq. ft bed area. <br /> 2- 10()0 gal . pre-cast tanks, + 1- 1000 gal . pump tank. <br /> , <br /> ConstructionProcedure For A Sewage Treatment Mound <br /> Soil Surface Preparation <br /> A 2 inch discharge pipe from the pump to end of the mound <br /> area shall be installed prior to soil surface preperation. <br /> The trench excavated to install the discharge pipe shall be <br /> carefully backfilled and compacted to prevent sepage of <br /> effluent . , <br /> The total area selected for the Mound, including that <br /> under the dikes, shall be roughened in order to thoroughly <br /> break up any existing sod layers and to provide a suitable <br /> transition zone between the original soil and the sand layer <br /> of the mound. The area shall be roughened only when the <br /> moisture content of, the soil 8 inches below the surface is <br /> drier than the plastic limit . The plastic limit is the soil <br /> moisture content below which the soil may be manipulated for <br /> purposes of install a soil treatment system, and above <br /> which manipulation l cause compaction and puddling. <br /> Surface preparation or scarification will be performed with <br /> a back-hoe bucket . There shall be no dead furrow in the <br /> mound construction area. <br /> Mound construction shall proceed immediately after surface <br /> preparation is completed. Every effort should be taken to <br /> prevent rain from falling on the prepared soil surface. <br /> • Construction Materials & Distribution of Effluent <br /> A clean washed sand layer shall be placed where the filter <br /> (rock bed) material is to be located. This sand layer_ must <br /> be at least 18- incies deep and should be deep enough to <br /> level area for m . A crawler tractor with a blade or <br /> bucket shall be use to move the sand into place. At least <br /> 6 inches of sand sh ll be kept under the tracks to minimize <br /> compaction of the s arified layer . The sand layer upon <br /> which the filter ma erial is placed shall be level from side <br /> to side and end to end. Only clean sand is to be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.