Laserfiche WebLink
,George Funk October B, 1992 <br /> A depth of at 1,_a.st 9 inches of Clean rock 1 1/4 inch <br /> diameter to 2 1/2 i6ch s in diameter , shall be placed on the <br /> sand layer prior to installing the distribution pipe. <br /> Pressure Di.stri.buti -'n <br /> E=fflueni shall he d ' stributed over the filter material by a <br /> 1 1/2 itch diameter perforated pipe under pressure. <br /> Perforation holes sia]. 1 be 1/4 inch in diameter drilled in a <br /> straight line al'-'ng the length sof the pipe. Hole spacing <br /> shall. be 36 inches. ' H'a'les shall be drilled straight into <br /> the pipe and not at an angle. A sharp drill shall be used <br /> and any burrs in the inside or outside of the pipe shall be <br /> removed. The perforated pipe laterals shall be installed <br /> level with the perforations downward. <br /> The perforated pipe laterals shall be connected to a inch <br /> diameter manifold p .pe and shall have their ends capped. <br /> The laterals shall e spaced no further than 4':) inches on <br /> center and no furth !r than 20 inches front the edge of the <br /> filter material . <br /> The manifold pipe shall be connected to the supply pipe from • <br /> the pump. The manifold shall be sloped toward the pump for <br /> complete drain back ' c'f effluent . <br /> Pump and Collection Tank <br /> A pump shall be used to deliver effluent to the mound. The <br /> pump shall be '::ast . ron or bronze fitted with stainless <br /> steel strews or con tructed of other sound, durable and <br /> corrosion-resistant materials. Location of pump tank and <br /> septic tank can be lvtional due to the use of a pressurized <br /> mound. <br /> . <br /> An alarm device sha 1 be installed to warn of pump failure. <br /> The dosing chamber ill be sized fc'r a minimum of •days of <br /> restricted use due c amount ':'f daily use. <br /> Pump Discharge <br /> The pump discharge capacity is based on the perforation <br /> spacing and perforation diameter . This system has <br /> individual lateral lengths of 5'0 feet ; laterals will be 1 <br /> 1/2 inch plastic pipe with 1/4 inch perforations spaced <br /> 36-inches apart . This size will require 7. 6 GPM per <br /> 100 <br /> square feet of bed area. <br /> A 36 GPM minimum pump discharge <br /> capacity is requirec . The pump discharge head shall be at <br /> least 5 feet greater than the head required to overcome the <br /> pipe friction loss and the elevation difference between the <br /> pump and the perforated laterals of the pressure <br /> distribution system, which is minimum of (see pump sheet ) <br /> i':'- foot head. <br />