My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01295 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0505 Old Crystal Bay Road South - 04-117-23-31-0003
>
Permits/Inspections
>
2011-01295 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:10 PM
Creation date
3/23/2018 3:07:45 PM
Metadata
Fields
Template:
x Address Old
Address
0505 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723310003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> o 4?. <br /> O CITY of ORONO <br /> Municipal Offices <br /> Street Address: Mailing Address: <br /> .c4 \ 1` s fr <br /> 2750 Kelley Parkway P.O. Box 66 <br /> � Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> kESH0g <br /> November 3, 2011 <br /> David Harmann <br /> 505 Old Crystal Bay Road South <br /> Long Lake, MN 55356 <br /> Re: 505 Old Crystal Bay Road S <br /> Building Permit Application #2011-01295 <br /> The City is in receipt of your building permit application which was received by this office on October 21, 2011. <br /> Your application is incomplete. <br /> The following items must be submitted or revised in order for your application to be considered complete and for <br /> the plan review to continue: <br /> 1. Certificate of Survey. A certificate of survey was submitted, but we require additional detail. Please <br /> provide a revised certificate of survey showing topography on the entire property. The City has maps with <br /> two-foot contours available for $12/acre which your surveyor can overlay onto your survey. Also, please <br /> provide additional grading showing proposed contours between the 944' and 946' to manage runoff within <br /> the property. <br /> 2. Wetland Delineation. A Manage 3 wetland exists on the property. Thi- till trigger the City's <br /> wetland buffer ordinance. Please provide a wetland delinPa+;--- delineation must be <br /> approved by the Minnehaha Creek Watershp,' ige of the wetland <br /> must be shown on the survey, along Ni )ack. Our wetland <br /> specialist will review the condition c improvements or <br /> enhancements to the buffer will be nec nhancement plan <br /> will also be required. <br /> 3. Escrow & Escrow Agreement. Buildi City's engineer <br /> require submittal of an escrow and an I p is to guarantee <br /> reimbursement to the City for out-of-poc / is. Additionally <br /> this escrow will guarantee conformanc, . m control and <br /> stormwater. The required escrow amoun nt is enclosed. <br /> The property owner must sign the escrow <br /> The above information is required in order for the ontact me at <br /> 952.249.4620 or by email at cmattson(cci.orono.mr <br /> })..i <br /> Sincerely, 1 / <br /> CITY OF ORONO `,\ <br /> ciJ1 <br /> Christine Mattson <br /> Planning Assistant <br /> c Lyle Oman, Building Official <br /> enclosures <br /> Telephone(952)249-4600 • Fax(952) 249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.