My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01026 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0425 Old Crystal Bay Road South - 04-117-23-31-0001
>
Permits/Inspections
>
2017-01026 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:04 PM
Creation date
3/23/2018 12:48:34 PM
Metadata
Fields
Template:
x Address Old
Address
0425 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Monday, October 02, 2017 9:31 AM <br /> To: 'Rick Hendel'; Rick Theisen rtheisen@hendelhomes.com) <br /> Cc: 'Mark Gronberg' <br /> Subject: 425 Old Crystal Bay Road t#2017-01026 <br /> Attachments: Escrow Agreement 2017-09293 &2017-01026.pdf <br /> Good Morning, <br /> Ours phon s are down so I'm sending an email this morning. <br /> Bu' mg Height. The defined building height is measuring sl htly over 30'. I think if the surveyor can identify an existing <br /> of elevation greater than the 984' contour currently show we should be okay. <br /> Top Foundation. The top of foundation elevation is shown n the survey. Please have the surveyor show the point or spot <br /> the perimeter of the foundation where the top of foundation elevation is in reference to. Please note,we expect the location <br /> to be consistent when submitting the foundation as-built. <br /> Landscape Plan. The landscape plan provided should be sh wn on the survey,especially the entrance monuments so <br /> we can verify they meet Code Section 78-1405(9). Please pr vide construction plans for the Entrance Monuments and <br /> Masonry Stone Columns(height,cross-section and footing etails). <br /> Escrow&Escrow Agreement. Permits involving grading and/o review by the City's engineer require submittal of an escrow <br /> and an escrow agreement. The purpose of the escrow is to gu rantee reimbursement to the City for out-of-pocket costs <br /> incurred during the review of your plans. Additionally this escr w will guarantee conformance with City Code Chapter 79 <br /> relating to erosion control and stormwater. The required escr w amount for this project is$2,500. No additional escrow <br /> money is required at this time. An updated agreement is enc osed combining the demolition and building permit <br /> escrows. The property owner must sign the escrow agreeme t and return. <br /> Please don't hesitate to contact us if you have any question. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN 155356(physical addres) <br /> PO Box 66 I Crystal Bay I MN 155323-0066(mailing address) <br /> lit 952.249.4620 I A 952.249.4616 <br /> ®cmattson@ci.orono.mn.us I " www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: November 10,2017 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.