Laserfiche WebLink
Top of Foundation. The top of foundation elevation is shown on the survey. Please have the surveyor show the point or spot <br /> on the perimeter of the foundation where the top of foundation elevation is in reference to. Please note,we expect the location <br /> to be consistent when submitting the foundation as-built. <br /> Landscape Plan. The landscape plan provided should be shown on the survey,especially the entrance monuments so <br /> we can verify they meet Code Section 78-1405(9). Please provide construction plans for the Entrance Monuments and <br /> Masonry Stone Columns(height, cross-section and footing details). <br /> Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal of an escrow <br /> and an escrow agreement. The purpose of the escrow is to gua antee reimbursement to the City for out-of-pocket costs <br /> incurred during the review of your plans. Additionally this escr w will guarantee conformance with City Code Chapter 79 <br /> relating to erosion control and stormwater. The required escr amount for this project is$2,500. No additional escrow <br /> money is required at this time. An updated agreement is encl sed combining the demolition and building permit <br /> escrows. The property owner must sign the escrow agreeme t and return. <br /> Please don't hesitate to contact us if you have any question. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN 155356(physical addres) <br /> PO Box 66 I Crystal Bay I MN 155323-0066(mailing addres) <br /> V 952.249.4620 I A 952.249.4616 <br /> ® cmattson@ci.orono.mn.us I www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: November 10,2017 <br /> 2 <br />