My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01026 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0425 Old Crystal Bay Road South - 04-117-23-31-0001
>
Permits/Inspections
>
2017-01026 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:04 PM
Creation date
3/23/2018 12:48:34 PM
Metadata
Fields
Template:
x Address Old
Address
0425 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723310001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknovyledg ement Form <br /> Permit #2017-01026 / 425 Old Crystal Bay Road S <br /> Builder Representative Name: IKICfr--- 4e-ijd <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insilation and/or drain tile inspection,a <br /> foundation as-built survey must be submitted and appeoved by the City or a Stop Work order <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspiction. <br /> I <br /> I <br /> Erosion control mechanisms must be installed and ins ected by the City prior to any land <br /> disturbing activities. The contractor must provide a inimum of a 24 hour notice prior to <br /> 124-- <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning12* <br /> and repair of roadways for any adverse impacts. <br /> No underground sewer within 20 feet of well. <br /> I �) <br /> Prior to the issuance of a Certificate of Occupancy an las-built survey and hardcover calculations <br /> must be submitted and approved. Rk--- <br /> 1 <br /> In the event of winter or other extended unfavorable)weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey)a Temporary Certificate of0( <br /> Occupancy(TCO) may be necessary. A TCO requires a$10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls,etc. not currently shown on the approved surviey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> 0(-- <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans ard a building permit to be submitted and \2-\,‹ <br /> approved prior to construction. <br /> i <br /> w:\street files\old crystal bay rd s\425\builder acknowledgement form 2017-01026&2017-00293.docx <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.