Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit I/ <br /> Plan Review <br /> State Surcharge <br /> Investigation Fee 1/1 <br /> SAC—Number of SAC Units (/ <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ /I Z.(P(9j 6tid <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing 0 Site Plumbing 0 Grading/Filling <br /> Poured Wall Silt Fence/Erosion Control Mechanical 0 Fire <br /> Foundation Survey 0 Hardcover Removal Fireplace 0 Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> Waterproofing/Drain tile Mfg. 0 Lawn Irrigation <br /> ❑ Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing Septic <br /> Insulation <br /> X As-Built Survey <br /> Final <br /> Lathe Required State Permits <br /> ❑ Other(specify) <br /> 0 Well l)Z(Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> ❑ Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />