Laserfiche WebLink
All friable and category II non-friable materials need to be removed, per applicable regulations, prior to <br /> and demolition efforts. Category I non-friable materials are allowed to be left in place for the demolition. <br /> However, the landfill must be made aware that the demolition debris will contain (minimal amounts of) <br /> category I non-friable asbestos containing material and is subject to the MPCA's rules and regulations <br /> pertinent to the demolition efforts (notifications, etc.). This survey should not be interpreted as a bidding <br /> document or as an asbestos project design. It is incumbent upon the contractor to verify quantities. <br /> Quantification of materials identified in this inspection report are approximations and based on observed <br /> quantities. Additional amounts of material may be present under floor, above ceilings and inside wall <br /> cavities and not fully quantified. For example, thermal system insulation indentified in a basement may <br /> also exist inside wall cavities. <br /> If you have any questions, please call us at the number above. <br /> Sincerely, <br /> Kevin Hagen <br /> Angstrom Analytical, Inc. <br />