Laserfiche WebLink
o Perimeter control along all roads and trails. <br /> o Perimeter control at the bottom of all slopes leading off site or <br /> toward water resources. <br /> o Perimeter control and/or cover around/on all large stockpiles. <br /> o Crushed rock or existing paved construction entrance. <br /> NOTE: <br /> > All erosion and sediment control measures must be in place before any land <br /> disturbing activity begins <br /> > Silt fence must be trenched in six inches and installed correctly <br /> A permanent stabilization plan that states the following(can be written on site plan): <br /> ❑ Addition of at least 6"of topsoil to all disturbed areas. <br /> ❑ Method for establishing permanent vegetative cover. <br /> A detailed schedule indicating dates and sequence of land-alteration activities: <br /> implementation,maintenance and removal of erosion and sedimentation-control <br /> measures, and permanent site-stabilization measures. <br /> A list of names, addresses,telephone numbers and responsibilities of all contractors, <br /> subcontractors and other persons who will engage in the land-disturbing activities. <br /> To avoid formal enforcement action,please submit the above mentioned information no later <br /> than 4:30 PM on Thursday,December 23,2010. As we review your submittals,we may find <br /> the need to request additional information, and will so inform you. Please contact me with any <br /> questions at 952-641-4504 or cbach@minnehahacreek.org. <br /> Sincerely, <br /> • <br /> I <br /> ����SAffiw, <br /> Catherine Bach <br /> District Technician <br /> CC: Melanie Curtis, City of Orono; Luke Schwitzer, MCWD Compliance Officer <br /> 18202 Minnetonka Boulevard, Deephaven,MN 55391 • 952-471-0590 • Fax:952-471-0682 • www.minnehahacreek.org <br />