My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. Retighten forms, if necessary,immediately after concrete is placed to eliminate mortar <br /> leaks. Carefully inspect falsework and formwork during and after concrete placement <br /> operations to determine abnormal deflections or signs of possible failure and make <br /> necessary adjustments to produce work of required dimensions. <br /> X. Clean,inspect and repair reusable forms thoroughly,if necessary,before each use. Do not <br /> use "patched" forms for exposed concrete surfaces,except as acceptable to Architect. <br /> Y. Do not displace or damage moisture barrier. <br /> 3.3 FIELD QUALITY CONTROL <br /> A. Inspection is subject to compliance with requirements affecting finish results only. <br /> Adequacy of formwork and shores to support necessary vertical and lateral loads and <br /> pressures is sole responsibility of Contractor. <br /> 3.4 APPLICATION OF FORM RELEASE AGENT <br /> A. Apply form release agent on formwork in accordance with manufacturer's instructions. <br /> Apply prior to placing reinforcing steel,anchoring devices,and embedded items. <br /> B. Do not apply form release agent where concrete surfaces are scheduled to receive special <br /> finishes or applied coverings which may be affected by agent. Soak contact surfaces of <br /> untreated forms with clean water. Keep surfaces wet prior to placing concrete. <br /> C. Do not apply form release agent where wood graining characteristics are required on <br /> finished concrete surfaces. Leave formwork dry. <br /> 3.5 FORM REMOVAL <br /> A. Do not remove forms, shores and bracing until concrete has gained sufficient strength to <br /> carry its own weight, and construction and design loads which are liable to be imposed <br /> upon them. Verify strength of concrete by compressive test results. <br /> B. Remove formwork progressively and in accordance with code requirements so that no <br /> shock loads or unbalanced loads are imposed on structure. <br /> C. Loosen forms carefully. Do not wedge pry bars,hammers,or tools against concrete <br /> surfaces. <br /> D. Store removed forms used for exposed architectural concrete in manner that surfaces to be <br /> in contact with fresh concrete will not be damaged. Do not use marked or scored forms. <br /> E. Remove forms not directly supporting weight of concrete as soon as stripping operations <br /> will not damage concrete. <br /> END OF DOCUMENT <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 03100 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.