My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Place concrete,strike-off,consolidate and screed and wood float surfaces to a smooth and <br /> uniform finish,free of open texturing and exposed aggregate. Test surfaces for trueness <br /> with a straightedge. Remove surface irregularities and refloat repaired areas to provide a <br /> continuous smooth surface. Work edges of slabs,gutters,back top edge of curb and <br /> formed joints with an edging tool,and round to 1/8"radius,unless otherwise indicated. <br /> Eliminate tool marks on concrete surface. <br /> H. Finishing: Broom or belt finish sidewalks and curbs except for specially finished areas. <br /> After the concrete has been floated it shall be given a coarse transverse scored texture by <br /> drawing a broom or burlap belt across the surface. Slope sidewalks to drain with all water <br /> pockets eliminated.All floated or broomed surfaces shall be finished to an FL 25 <br /> tolerance. <br /> I. If objectionable air holes,honeycombed areas or other surface defects occur,as <br /> determined by the Architect/Engineer;repair defects in accordance with ACI 301,Article <br /> 13.6. <br /> J. Apply curing compound on finished surfaces immediately after placement.Apply in <br /> accordance to manufacturer's recommendations. <br /> K. Cleaning: Sweep and clean concrete surface of all debris;remove all foreign material <br /> from joints and seal as specified. <br /> L. Protection: Protect concrete from all damage prior to final acceptance.Remove concrete <br /> containing excessive cracking,fractures, spilling or other defects and reconstruct entire <br /> section between regularly scheduled joints when directed at no additional cost to the <br /> Owner. <br /> M. Surface Drainage: All concrete surface shall be placed so as to drain and prevent water <br /> from puddling. Conform to slopes shown on plans;where slopes are not shown,slabs <br /> shall have a minimum slope of 1/8 inch/per ft.in the direction of drainage as interpretable <br /> from contours. <br /> 3.3 QUANTITIES <br /> A. Walks: 4"Thick Concrete <br /> 4"Thick Granular Fill <br /> B. Curb and Gutter: Concrete as detailed <br /> 4"Thick Crushed Aggregate Base <br /> 3.4 TESTING <br /> A. General Requirements: The Contractor shall retain an independent testing laboratory to <br /> conduct laboratory and field testing as noted below. <br /> B. Materials Testing in Field: <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02515 -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.