My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electric Red <br /> Gas, Oil and Dangerous Material Yellow <br /> Telephone, telegraph, television, police <br /> and line communications Orange <br /> Water Blue <br /> Sewer Green <br /> 3.7 RESTORATION <br /> A. Areas of new surfacing: <br /> 1. Backfill to the proposed subgrade elevation, i.e. finish grade, less the thickness of <br /> pavement and base. <br /> 2. Where new surfacing is not shown or does not extend to the limits of trench work, this <br /> contractor shall be responsible for surface improvements/restoration consistent with <br /> existing surface. <br /> B. Lawns: Minimum requirements will be 6 inch thickness of specified topsoil and cultured <br /> sod. Seed is not acceptable. <br /> 3.8 FIELD AND LABORATORY TESTS <br /> A. General Requirements: The Owner shall retain an independent geotechnical testing <br /> laboratory to conduct laboratory and field testing of soils prior to and during excavation, <br /> filling,backfilling and compaction operations. Soil testing to include that specified above <br /> and the following: <br /> 1. All stabilization aggregate, bedding, initial backfill, select and general trench backfill <br /> material shall be analyzed for compliance with specifications. <br /> 2. Geotechnical laboratory representative shall be present at site each day when trench <br /> excavation and backfill are being accomplished. The laboratory representative shall <br /> approve the trench subgrade as being stable or rrecommend the application of pipe <br /> trench stabilization prior to placing of bedding material. <br /> 3. The independent testing laboratory shall submit to the Architect/Engineer copies of all <br /> soil reports(mechanical analysis, Atterburg Limits, compaction tests, etc.) as they are <br /> completed. <br /> 4. No trench backfill materials shall be placed unless necessary soil analysis tests have <br /> been performed and materials found in conformance with specifications. No trench <br /> backfill shall be placed without specified field density tests performed. <br /> 5. Establish Standard Proctor(ASTM D698)for density and moisture content as <br /> applicable to pipe bedding and trench fill material. <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02220 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.