My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Granular soil (GW, GP, GP-GM, SW, SP OR SP-SM)with 5%or less passing the <br /> 200 sieve. The maximum particle size shall be 1/2" for plastic pipes or polyethylene <br /> wrapped pipes or coated pipes. The maximum particles may be up to 1" for <br /> Reinforced Concrete Pipe. <br /> C. Initial Backfill: Shall be the same as bedding material. <br /> D. Duct backfill : Shall be the same as bedding material. <br /> • E. Select Trench Backfill shall be: Granular soil(GW, GP, GP-GM, SW, SP OR SP-SM, <br /> SM, SC)with 5%or less passing the 200 sieve. <br /> F. General Trench Backfill shall be: <br /> 1. Soils noted for select trench backfill, bedding and initial backfill materials are <br /> acceptable. <br /> 2. The following soils are also acceptable: <br /> a. Lean clay mineral soils with a liquid limit of 35 or less and a plasticity index of 15 <br /> or less. <br /> G. Geotextile for pipe trench stabilization: Use hErafi Type 500C, or approved equal. <br /> H. Material Availability: <br /> 1. Based on the geotechnical report,the following soil types are anticipated to be on site: <br /> (General trench backfill)remove the brackets. <br /> 2. Based on the geotechnical report, the following soil types are unlikely to be available <br /> on site;therefore,the following materials must be imported: (select trench backfill), <br /> (initial backfill), remove all brackets(stabilization aggregate), (bedding material). <br /> PART 3 EXECUTION <br /> 3.1 LOCATION TOLERANCES <br /> A. The Utility Contractor shall accurately locate all structures per the coordinates given for <br /> the center of the structures. The following tolerances are required: <br /> 1. CB on curb lines: + .25'horizontal. <br /> 2. CB or MH in grass areas: + 1.0'horizontal. <br /> 3. Hydrant locations: + .5'horizontal. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02220 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.