My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Cut, fill and grade to transform site to elevations and contours shown on site plan with <br /> allowances made for granular borrow, subgrade improvement, cushions, topsoil clay <br /> underlayment, top soil, and pavements. Grading tolerance,unless noted differently on <br /> the grading plan, shall be as noted above. <br /> 2. Slope grades away from buildings to insure temporary and permanent drainage <br /> protection before and after topsoil or other surfaces are placed. <br /> 3. Place backfill against foundations only after concrete has attained design strength and <br /> appropriate bracing is in place. <br /> 4. Remove all debris, building materials, large stones, boulders, branches or other <br /> obstructions. Hand level around permanent obstructions. <br /> 5. Finish by blade grader and heavy steel "H" beam drag. <br /> 6. Ease new grades into existing grades without awkward or abrupt transitions. <br /> B. Finish Grading, Topsoil Areas: <br /> 1. Place topsoil so that a minimum depth of 6" (maximum thickness of 12")is achieved <br /> after rolling and compaction. At pond area perimeter and wetland mitigation area, <br /> organic topsoil shall be placed to a minimum thickness of 12". All holes, depressions <br /> and rivulets shall be filled in and brought to a smooth grade. <br /> 2. Blade, drag and rake to uniform slopes, achieving a uniform surface. All sticks, <br /> branches, roots, stumps, rocks and other debris on the surface shall be picked up and <br /> removed from the site. <br /> 3. The finish grade preparation shall be performed only during periods when beneficial <br /> results are likely. During periods of excess drought, moisture or freezing conditions, <br /> the Contractor shall stop work and resume operations only when desired results are <br /> obtainable. <br /> 4. When the work is complete the topsoil shall be free of rocks(1" or larger) and other <br /> deleterious materials. Drainage should generally occur as interpretable from contours <br /> with no awkward or abrupt transitions of grade. <br /> 3.8 QUALITY CONTROL BY TESTING LABORATORY <br /> A. The Testing Laboratory, as retained by the Owner, shall conduct laboratory and field <br /> testing of soils prior to and during excavation, embankment placement and compaction <br /> operations. Soils testing shall include the following: <br /> 1. All fill soils, including topsoil, shall be analyzed for compliance with specifications. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 02200- 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.