My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 QUALITY ASSURANCE <br /> A. Utilize equipment of proper size and in good working condition to prosecute the work to <br /> full completion in a satisfactory manner. <br /> B. Utilize experienced personnel familiar with the equipment, methods and procedures for the <br /> job. <br /> C. Testing Laboratory as retained by Owner, approved by A/E. <br /> D. Testing Laboratory shall perform the following operations: <br /> 1. Inspect and approve soil conditions at bottom of all excavations; determine limits of <br /> excavation where applicable. <br /> 2. Qualify on-site and borrow soils for suitability to project requirements. <br /> 3. Observe and approve contractors operations within context of soil limitations and <br /> project requirements. <br /> 4. Choose location and conduct soil density tests on fill and backfill materials when unit <br /> prices apply. <br /> 5. When applicable, determine quantities of excavation and/or fill for payment. <br /> E. Testing Laboratory shall advise A/E of any materials or operations that will not produce <br /> specified results. <br /> F. When directed by Testing Laboratory, Contractor shall provide fill material samples for <br /> testing. <br /> G. Costs of retesting and replacement of rejected fill material shall be at the Contractors <br /> expense. <br /> H. Testing Laboratory shall provide soil/test reports before placement of concrete <br /> foundations;test reports shall be available within 24 hours of testing to minimize delays. <br /> I. Testing Laboratory shall provide a written report of all operations observed including soils <br /> analysis and compaction reports, volumes of excavation/fill when required, and statement <br /> that work has been performed in accordance with specified requirements. <br /> 1.3 REFERENCES <br /> A. American Society for Testing and Materials: ASTM <br /> 1. ASTM D698, "Test Methods for Moisture-Density Relations of Soils." <br /> ADDENDUM#1 <br /> 1607.001 - ORONO ICE ARENA(CP-2) Page 02200 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.