My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 QUALITY ASSURANCE <br /> A. Welding equipment and procedures shall comply with AWS Structural Welding Code <br /> requirements. <br /> B. Welders shall be qualified in accordance with Section 6.4 of AWS Structural Welding <br /> Code. <br /> 1.5 DELIVERY, STORAGE AND HANDLING <br /> A. Store decking off ground and under waterproof cover. Elevate one end to permit <br /> drainage. <br /> 1.6 STEEL ROOF DECKING TO RECEIVE SPRAYED FIREPROOFING <br /> A. Provide decking to receive sprayed fireproofing free of amounts of lubricants,oils or <br /> other contaminants which would significantly impair adhesion of sprayed fireproofing. <br /> PART 2 PRODUCTS <br /> 2.1 MATERIALS <br /> A. Wide Rib Steel Roof Deck: As defined in Steel Roof Deck Design Manual,of depth and <br /> gauge shown on drawings;Nucor Vulcraft Divisions Type 1.5B,or 1.5BI,Wheeling <br /> Corrugating Type B or BW,Bowman Type B,Epic Metals Type B or 1B. <br /> B. Basic Steel Decking with Painted Shop Finish: ASTM A611. <br /> C. Shop Paint Finish: Chemically clean,phosphatize and properly prepare surface for <br /> painting. Coat with rust-inhibitive primer,standard with manufacturer,applied in even <br /> coat and oven cured. <br /> D. Welding Electrodes: Type required for materials being welded. <br /> 2.2 FABRICATION <br /> A. Fabricate metal decking in accordance with reviewed shop drawings. <br /> B. Cut sheets in lengths to extend over minimum of 3 spans. <br /> C. Cut sheets to required lengths so that end joints will occur over supporting members. <br /> D. Lap ends of sheets minimum of 2 inches centered over centerlines of supports. <br /> E. Fabricate sump pans from single piece of 14 gauge galvanized steel.Fabricate other <br /> accessories from 20 gauge sheets,unless noted otherwise,with finish to match decking. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 05312-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.