My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Provide concrete having minimum compressive strength of 3,000 psi at time of initial <br /> prestress,or greater if required by design. <br /> D. Cast in inserts,bolts and plates as noted and detailed on drawings or required for <br /> complete installation of deck. <br /> E. Provide openings shown on drawings that exceed 8 inches in diameter or side dimension. <br /> F. Provide standard finishes as follows: <br /> 1. Underside: Resulting from casting against approved forms using good industry <br /> practice in cleaning of forms,design of concrete mix,placing and curing. Small <br /> surface holes caused by air bubbles,normal color variations,normal form joint <br /> marks,and minor chips and spalls will be tolerated,but no major or unsightly <br /> imperfections,honeycomb,or other defects will be permitted. <br /> 2. Topside: Result of vibrating screed and additional hand finishing at projections. <br /> Normal color variations,minor indentations, minor chips and spalls will be permitted. <br /> No major imperfections,honeycomb,or defects will be permitted. <br /> 3. Exposed Ends: Recess strands,fill with grout and sack finish surfaces. <br /> G. Minor patching in plant will be acceptable provided structural adequacy and appearance <br /> are not impaired. <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Examine supporting structure and conditions under which precast concrete work is to be <br /> erected prior to commencement of work. <br /> B. Do not proceed with installation until any unsatisfactory conditions found have been <br /> corrected. <br /> 3.2 ERECTION <br /> A. Lift,place and secure deck units to supports in accordance with reviewed shop drawings <br /> and manufacturer's printed instructions. <br /> B. Follow erection procedures and sequence of erection as recommended by manufacturer. <br /> C. Align and level members within allowable tolerances. Adjust variations between adjacent <br /> members by jacking,loading,or other feasible method as recommended by manufacturer <br /> and acceptable to Architect. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA (CP-2) Page 03412-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.