My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. At concrete with moist type cure,cover with moisture-proof covering.Remove and wet <br /> concrete as often as required to keep damp for entire curing period. Provide continuous <br /> curing with no dryouts during entire period. <br /> 3.7 QUALITY CONTROL TESTING DURING CONSTRUCTION <br /> A. Coordinate with ITL employed by the Owner to make,cure and determine strength of <br /> concrete test cylinders cast in field. Perform in accordance with ASTM C172-Method of <br /> Sampling Freshly Mixed Concrete,ASTM C31 -Method of Making and Curing Complete <br /> Test Specimens in Field and ASTM C39-Test Method for Compressive Strength of <br /> Cylindrical Concrete Specimens.Evaluation and acceptance of concrete shall be in <br /> accordance with Section 4.7 of ACI 318 with following exceptions: <br /> 1. Make 1 set of cylinders for each day's operation and each type of concrete where less . <br /> than 50 cubic yards is placed,plus additional set for each 50 cubic yards(or fraction <br /> thereof)over and above first 50 cubic yards of each type. Test sets shall consist of 4 <br /> cylinders with fourth cylinder to be field-cured specimen. For slabs placed when <br /> temperatures are expected to fall below 32 degrees F within 72 hours of placement <br /> cast in place(pop out)cylinders shall be used. These cylinders shall be placed close <br /> to corners and perimeter of pour. <br /> 2. Store field-cured cylinder as near as possible to location of concrete represented by <br /> sample and give cylinder,insofar as practicable, same protection and curing as <br /> adjacent concrete. Keep other 3 cylinders covered with plastic or wet burlap and in <br /> 60- 80 degrees F.temperature range for 24 hours,allowing no injury to cylinders. <br /> After this period,and prior to age of 48 hours, deliver 3 cylinders to laboratory for <br /> additional curing,taking care not to freeze,crack or damage specimens. <br /> 3. Deliver field-cured cylinder to laboratory at 28 days of age for testing to check <br /> adequacy of curing and protection as described in Article 4.7.3 of ACI 318. <br /> 4. Test other 3 cylinders,laboratory cured,as follows: 1 at 7 days of age for projecting <br /> probable 28 day strength and 2 cylinders at 28 days for acceptance of average <br /> strength as described in Article 4.7.1 of ACI 318. <br /> 5. If additional field cured specimens are required to verify early strength of concrete, <br /> contractor shall pay for additional testing. <br /> B. Determine slump of concrete in accordance with ASTM C143 - Standard Test Method for <br /> Slump of Portland Cement Concrete. Perform 1 test for each set of test cylinders. <br /> C. Determine air content of fresh concrete,when air content is specified,in accordance with <br /> ASTM C173 or ASTM C231. Where placement is by pump,air content shall be <br /> measured at location of placement. For concrete exposed to freezing and thawing, <br /> concrete from each truck shall be tested and concrete not meeting specified percentages <br /> shall not be placed. For interior concrete not exposed to freezing and thawing,such as <br /> lightweight concrete on metal decking,perform 1 test for each set of test cylinders. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 03300- 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.