My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums to drawings/specs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
1025 Old Crystal Bay Road North - No PID
>
Misc
>
Addendums to drawings/specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:49 AM
Creation date
3/15/2018 1:44:12 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
surface to tolerances of FF15 (floor flatness)and FL13 (floor levelness) for slabs-on-grade <br /> and FF15 for elevated slabs,measured according to ASTM E 1155. Slope surfaces <br /> uniformly to drains where required. After leveling,roughen surface before fmal set with <br /> stiff brushes,brooms,or rakes. <br /> I. Float Finish: Apply float finish to monolithic slab surfaces to receive trowel finish and <br /> other finishes as specified;slab surfaces to be covered with membrane or elastic <br /> waterproofing, membrane or elastic roofing,or sand-bed terrazzo;and where indicated. <br /> After screeding,consolidating and leveling concrete slabs,do not work surface until ready <br /> for floating.Begin floating,using float blades or float shoes only,when surface water has <br /> disappeared,or when concrete has stiffened sufficiently to permit operation of power- <br /> driven floats,or both. Consolidate surface with power-driven floats or by hand-floating if <br /> area is small or inaccessible to power units. Finish surfaces to tolerances of F 48 (floor <br /> flatness)and FL18 floor levelness)for slabs-on-grade and FF18 for elevated slabs, <br /> measured according to ASTM E 1155. Cut down high spots and fill low spots. <br /> Uniformly slope surfaces to drains. Immediately after leveling,refloat surface to a <br /> uniform,smooth,granular texture. <br /> J. Trowel Finish: Apply a trowel finish to monolithic slab surfaces exposed to view and <br /> slab surfaces to be covered with resilient flooring,carpet,ceramic or quarry tile,paint,or <br /> another thin film-fmish coating system. After floating,begin first trowel-finish operation <br /> using a power-driven trowel. Begin final troweling when surface produces a ringing <br /> sound as trowel is moved over surface. Consolidate concrete surface by final hand- <br /> troweling operation,free of trowel marks,uniform in texture and appearance,and finish <br /> surfaces to tolerances of F120(floor flatness)and FL17 (floor levelness)for slabs-on-grade <br /> and FF20 for elevated slabs, measured according to ASTM E 1155. Grind smooth any <br /> surface defects that would telegraph through applied floor covering system. <br /> K. Trowel and Fine Broom Finish: Where ceramic or quarry tile is to be installed with thin- <br /> set mortar,apply a trowel finish as specified,then immediately follow by slightly <br /> scarifying the surface with a fine broom. <br /> L. Nonslip Broom Finish: Apply a nonslip broom finish to exterior concrete platforms, <br /> steps,and ramps,and elsewhere as indicated. Immediately after float fmishing, slightly <br /> roughen concrete surface by browning with fiber-bristle broom perpendicular to main <br /> traffic route. Coordinate required final finish with Architect before application. <br /> M. Non-Slip Abrasive Finish: At exterior platforms,ramps, stairs,slabs at entry,stoops and <br /> interior ramps and other areas indicated on drawings. Blend abrasive aggregate with <br /> Portland cement in proportions recommended by manufacturer of aggregate. Float finish <br /> concrete surface,apply approximately two-thirds of blended material to surface by <br /> method that insures even coverage without segregation. Float surface immediately after <br /> application,after material has been embedded. Remainder of blended material shall be <br /> applied to surface at right angles to previous application. Follow with second floating, <br /> embed material and complete with broomed floated trowel finish to expose non-slip <br /> aggregate. Rate of application shall not be less than 25 pounds per 100 square feet. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA (CP-2) Page 03300- 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.