Laserfiche WebLink
4. Note: At Contractor's option,approved bonding compound may be used in lieu of <br /> bonding grout. Install in accordance with manufacturer's instructions. <br /> U. Bond concrete toppings placed over concrete slabs to base slabs using bonding <br /> compound. Install in accordance with manufacturer's instructions. <br /> 3.2 CONSTRUCTION,CONTRACTION AND EXPANSION JOINTS <br /> A. Provide construction joints when stoppage of concreting operations occurs. <br /> B. Continue reinforcing steel across construction joints unless noted or detailed otherwise. <br /> C. Unless detailed otherwise,locate horizontal construction joints in walls and columns at <br /> underside of floor slabs and beams. <br /> D. Unless detailed otherwise,locate construction joints in supported floors of reinforced <br /> concrete structures at center span of slabs,beams or girders with provisions for transfer of <br /> shear and bending forces through joints.Provide joints perpendicular to main <br /> reinforcement with keys and dowels as detailed. <br /> E. Provide very lightly rounded edges at construction,control and expansion joints where <br /> slab joint will be exposed. <br /> F. Provide joints in concrete slabs-on-grade where shown and constructed as detailed. <br /> Where contraction joint spacings are not specifically shown they shall be spaced <br /> approximately 15 feet on centers at interior locations where joints will be exposed or <br /> under non-resilient floor covering. At interior locations below resilient finish or carpet <br /> spacings may be increased to approximately 30 feet. Interior panels shall be near-square <br /> with short: long side ratio not less than 2:3. At exterior locations spacings of contraction <br /> joints shall not exceed 10 feet on centers and short-long side ratio shall not be less than <br /> 3:4. Contraction joints shall be made to depth of 1/4 slab thickness by saw-cuts,joint <br /> formers or other method acceptable to Architect. <br /> G. Provide cleanly cut,straight joints in toppings over joints in base slab. Provide tooled, <br /> lightly rounded edges where exposed. <br /> H. Provide vertical construction, contraction and expansion joints in walls as detailed. Pour <br /> sections alternately with minimum waiting period of 48 hours between adjacent pours. <br /> Unless noted otherwise,locate joints midway between columns. Do not locate joints <br /> within 5 feet of corner,wall intersection or column. Unless noted otherwise locate <br /> vertical contraction joints in walls at 30 feet maximum spacings. <br /> I. Install waterstops in concrete joints where noted. <br /> ADDENDUM#1 <br /> 1607.001 -ORONO ICE ARENA(CP-2) Page 03300-8 <br />