Laserfiche WebLink
Crystal Bay Business Center II <br /> Plumbing <br /> Plan No. 087584 <br /> Page 3 <br /> June 19, 2008 <br /> b. The system must then be filled with a water chlorine solution containing at least 50 parts per million of <br /> chlorine and allowed to stand for 24 hours; or a solution containing at least 200 parts per million of <br /> chlorine and allowed to stand for three hours; and <br /> c. Following the allowed standing time the system must be flushed with clean potable water until no <br /> chlorine remains. <br /> 11. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. This includes all <br /> portions of the storm sewer located within 10 feet horizontally of the building or water service piping. <br /> NOTE(S): <br /> 1. The scope of this project consists of the construction of a new shell building. The plumbing installation <br /> includes a trench drain,a flammable waste interceptor,a floor drain,hose bibbs, an irrigation system, and <br /> interior roof drains. <br /> 2. This facility will be served by new municipal sewer and water service connections. The site utilities for this <br /> project are reviewed under Plan No. 087547. <br /> 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the <br /> plans may use the plans for construction. If another plumber is contracted to install the plumbing,they must <br /> submit their own plans and specifications for the project. <br /> 4. The Minnesota Plumbing Code is available on our website at: www.doli.state.mn.us/plumbing.html. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information,or advanced knowledge make improvements necessary. <br /> Approved: <br /> ( Marise A.Widmer <br /> 1 ' Public Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 443 Lafayette Road North <br /> St.Paul,Minnesota 55155-4343 <br /> 651/284-5887 <br /> MAW:jat <br /> cc: Project Owner <br /> Voson Plumbing,Inc. <br /> Mr. Lyle Oman,Building Official <br /> File <br />