MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY <br /> Division of Construction Codes and Licensing <br /> REPORT ON PLANS <br /> Plans and specifications on sewer and/or water service connection: Crystal Bay Business Center II, Service <br /> Connections, 2725 Wayzata Boulevard West,Orono,Hennepin County,Minnesota,Plan No. 087547 <br /> OWNERSHIP: <br /> SUBMITTER(S): Voson Plumbing,Inc., 1515-A Fifth Street South, Hopkins,Minnesota 55343 ify <br /> Plans Dated: April 9, 2008 <br /> co.), X 2008 <br /> Date Received: August 5, 2008,June 18,2008,May 30, 2008 pF� <br /> RoN,' <br /> Date Reviewed: August 5,2008 <br /> SCOPE: The plans and specifications describe the water service and building sewer connections for the <br /> referenced facility. The review is limited to the design of this particular project only, and does not cover the <br /> plumbing within the building. The review is based upon the supposition that the data on which the design is <br /> based are correct, and that necessary legal authority has been obtained to construct the project. The <br /> responsibility for the design of structural features and the efficiency of equipment must be taken by the project <br /> designer. Approval is contingent upon satisfactory disposition of any requirements included in this report. <br /> Special care should be taken to insure that the material and installation are in accordance with the provisions of <br /> the Minnesota Plumbing Code and applicable licensing requirements. <br /> Enclosed is a copy of the report and transmittal letter to be forwarded to the project owner. <br /> INSPECTIONS: All plumbing installations, including water service and building sewers,must be tested and <br /> inspected in accordance with the requirements of the Minnesota Plumbing Code. It is the responsibility of the <br /> contractor/installer to notify the Minnesota Department of Labor and Industry when an installation for a state <br /> contract job,licensed facility, or project in an area where there is no local administrative authority is ready for an <br /> inspection and test. To schedule inspections,contact the state plumbing standards representative for your region, <br /> or call Jim Peterson at 651/284-5889. <br /> REQUIREMENT(S): <br /> 1. AWWA C 900 PVC pipe may be used for the water service only if approved as an alternate material by the <br /> administrative authority(see Minnesota Rules,part 4715.0510 and part 4715.0330). <br /> 2. The PVC plastic pipe material to be used for the building sewer must meet one of the following <br /> ASTM Standards: D3034,F789,D2665,or F891. The installation must comply with ASTM <br /> Standard D2321 (see Minnesota Rules,part 4715.0530). Solvent weld joints in PVC and CPVC pipe must <br /> include use of a primer which is of contrasting color to the pipe and cement(see Minnesota Rules, <br /> part 4715.0810, subpart 2). <br /> 3. All joints and connections in the storm sewer system shall be gastight or watertight(see Minnesota Rules, <br /> part 4715.0700). Approved resilient rubber joints must be used to make watertight connections to <br /> manholes, catchbasins, and other structures. Cement mortar joints are permitted only for repairs and <br /> connections of existing lines constructed with such joints(see Minnesota Rules,part 4715.0750). <br /> 4. Draintile pipe which is directly connected to the storm sewer system is classified as storm sewer. Since all <br /> portions of storm sewer located within 10 feet of the water service must be tested,the piping located within <br /> 10 feet of the new water service must be hard piped,relocated, or removed. It must be verified that all <br /> draintile inlet elevations to the catch basins are above the storm sewer outlet elevations. <br />