My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09293 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0160 Old Crystal Bay Road North - 33-118-23-43-0006
>
Septic
>
2005-P09293 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:52:01 PM
Creation date
3/7/2018 9:39:33 AM
Metadata
Fields
Template:
x Address Old
House Number
160
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
160 Old Crystal Bay Road North
Document Type
Septic
PIN
3311823430006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM Geotextile fabric <br /> 1. Select number of perforated laterals 3 carter inch orations s aced GYjj- <br /> ' <br /> 2. Select perforation spacing= feet. 9"of rock <br /> Perf Sizing 7/32" /4 <br /> 3. Since perforations should not be placed closer than 1 ft. to Perf Spacing 15-5 <br /> the edge of the rock layer(see diagram),subtract 2 ft. from <br /> the rock layer length. Perforation Discharges In gpm <br /> G3 -2 ft. _ feet. perforation diameter <br /> �s head inches <br /> (feet) 1/8*13/16 7/32 114 <br /> 4. Determine the number of spaces between perforations. 1.00 0.18 0.42 0.56 0.74 <br /> Divide the length above by perforation spacing and roiuld 2 Ob 0.26 0.59 0.80 1.04 <br /> down to nearest whole number. <br /> 5.0 0.41 0.94 11.26 1.65 <br /> Length perf.spacing= <o/ ft.- 3 ft. = Zo spaces C use 1.0 root for single-fwAytxxnes. <br /> (3) (2) b use 2.0 feet for onythang else. <br /> l \ ' Potentiol for pugging <br /> 5. Number of perforations is equal to one plus.the number of <br /> perforation spaces . <br /> Maximum number of quarter inch perforations pes <br /> Z spaces+ 1 = Z� perforations/lateral lateral to guatnantee<10%discharge variation <br /> Per on <br /> 6. Multiply perforations per lateral by number of laterals to s�feecttjg A <br /> get total number of perforations. 2.5 14 <br /> mew3 x 5 (03 perforations. 13 17 <br /> 3.3 12 16 25 <br /> Calculate the square footage per perforation(6-10 sqft/perf) 4.0 11 15 23 <br /> System area: 10 x 63 = 3 o '114 5.0 10 14 22- <br /> 0 C. _ Ok <br /> area pummm+ _ /o sgft/perf <br /> gWMW LOCATED AT END W M 911RE 08"UNDTM Vol <br /> 7. Determine required flow rate by multiplying <br /> number of perforations by flow per perforation �. <br /> �3 x a7y = 5� gpmWW PwRal <br /> , .. <br /> 8. If laterals are connected to header pipe as shown on upper <br /> example,to select minimum required lateral diameter;enter �t <br /> table with perforation spacing and number of perforations U,,,,,4W <br /> .wawa asrwwrton w ra.o <br /> per lateral. Select minimum diameter fqr <br /> Perforated lateral= 2" inches. <br /> &SC 2." X <br /> 9. If perforated lateral system is attached to manifold pipe near 0 V W rw,%W""a ' <br />`f the center,lower diagram,perforated lateral length and <br /> number of perforations per lateral will be approximately one <br /> half of that in step 8. Using these values,select minimum <br /> diameter for perforated lateral = inches. ��"°" <br />
The URL can be used to link to this page
Your browser does not support the video tag.