My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09293 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0160 Old Crystal Bay Road North - 33-118-23-43-0006
>
Septic
>
2005-P09293 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:52:01 PM
Creation date
3/7/2018 9:39:33 AM
Metadata
Fields
Template:
x Address Old
House Number
160
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
160 Old Crystal Bay Road North
Document Type
Septic
PIN
3311823430006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELECTION PROCEDURE <br /> Perforation Discharges in gpm <br /> A. Determine pump capacity: perforation diameter <br /> gravity distribution head inches <br /> 1.Minimum required discharge is 10 gpm (feet) 1/8* 3/16 7/32 114 <br /> Z.Maximum suggested discharge is 45 gpm 1.0a 0.18 0.42 0.56 0.74 <br /> pressure distribution 2.0b 0.26 0.59 0.80 1.04 <br /> see pressure design worksheeet 5.0 0.41 1 0.94 1 1.26 1.65 <br /> Selected pump capacity: 5'0 gpm C Use j1.0 foot for single-family homes. <br /> b Use 2.0 feet for anything else. <br /> Potential for plugging <br /> B. Determine head requirements: <br /> 1.Elevation difference between pump and point of discharge. . � <br /> 10 feet <br /> 2.Special head requiremen-6 <br /> If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold.If-c-ravity system,zero. S1 feet <br /> soil treatment <br /> 3.Friction loss system <br /> a.`Enteifriction loss table with m and pipe diameter. riteontaglIps <br /> SP P�P Read friction loss in feet mer 100 feet from table. Inlet etevaflo9 differenceF.L. _ x•99 .ft./100ft of pipe p4b.Determine total pipe length from pump to discharge -- -- ................. ....... <br /> point.Estimate by adding 25 percent to pipe length for fitting <br /> lose Equivalent pipe length times 1.25=total pipe length <br /> Z I x125= Ex-•zs feet <br /> c.Calculate total friction loss by multiplying friction loss Friction loss in Plastic Pipe <br /> in ft/100 ft by equivalent pipe length. Per 100 feet <br /> Total friction loss= z 6•a 5' x 3-99, + p <br /> 100= = feet nominal <br /> pipe diameter <br /> 4.Total head required is the sum of elevation difference,special head 9 <br /> flow rate 1.5" Y' <br /> requirements,and total emiction loss. 20 2.47 0.73 0.11 <br /> �0 + 5 + Z (1) (2) (3c) 2$ 3.73 1.11' 0.16 <br /> Total.head: i:' feet zo 4 �' 3011 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> 40 &91 2.64 0.39 <br /> 45 11.07, 3.28 0.48 <br /> C. Pump selection V13.46 ��0.58 <br /> 55 4.76 '::0.70 <br /> I.A pump must be selected to deliver at least $� gpm 60 5.60 0.82 <br /> (Step A)with-at least Zo feet of total head (Step B). 65 6.48 0.95 <br /> 70 1 7.44 1.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.