My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04549 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Permits/Inspections
>
2001-P04549 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:58 PM
Creation date
2/27/2018 11:36:13 AM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> (PRIOR APPROVALS—Continued) <br /> For complete requirements, see Specification Section 01630 = Substitutions and <br /> Product Options. <br /> Section No. Item Type Acceptable Manufacturer <br /> 08200 2.0I.A.I Wood Doors Oshkosh <br /> 15440 P-2H ADA Lavatory Plumberex Specialty Products <br /> 15862 2.02 Variable Frequency Yaskawa <br /> Drive <br /> 15910 2.01 Dampers Pottorff <br /> 15910 2.02 Fire and Smoke Dampers Pottorff <br /> DETAILS OF CONSTRUCTION <br /> 1. DETAIL 8/4-3 FLOORS/WALLS. Revised this addendum. <br /> 2. DETAIL 2/5-1 DOOR/OPENING SCHEDULE. Reissued this addendum. <br /> 3. DETAIL 8/6-1 STAIR/RAILING. Issued this Addendum. <br /> DRAWINGS <br /> 1. DRAWING A0.1 DEMOLITION PLANS <br /> A. Add Keynote 55: Demolish Ceiling <br /> B. Drawing H6/A0.1 Main Level Demolition Plan: Add Keynote 55 to rooms <br /> A127,A131,A132,and A133.(See A1.1 for locations of rooms). <br /> 2. DRAWING A1.1 FLOOR PLANS <br /> A. Revise Drawing H1/A1.1 Main Level Floor Plan per attached R1/A1.1. <br /> B. Revise Drawing H6/A1.1 Upper Level Floor Plan per attached R2/A1.1. <br /> 3. DRAWING S1 TITLE SHEET <br /> A. Add the following section: <br /> "Composite Steel Deck <br /> Weld composite steel deck to supports with 5/8"diameter puddle welds at <br /> 12"o.c. Screw side laps at 36"max o.c.with#10 Tek screws. Deck flutes <br /> and ribs must line up from one span of deck to the next." <br /> 4. DRAWING M1.1 MECHANICAL PLAN LOWER LEVEL <br /> A. Add the following to key note#4: <br /> "Support all piping on field fabricated supports securely anchored to floor. <br /> Do not support piping from structure above. The inlet is to allow the steam <br /> piping to be completed and operational prior to new floor construction. <br /> Provide plywood protection of all piping during the course of construction." <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.