Laserfiche WebLink
DO 5. DRAWING M2.3 MECHANICAL SCHEDULES <br /> A. Delete VAV Terminal Unit Schedule with RI/M2.3 <br /> 6. DRAWING E2.1 FLOOR PLAN POWER AND SYSTEMS—SCHEDULES <br /> A. Motor and Equipment Schedule: Revise motor#6, RE-1 to be controlled by <br /> VFD supplied by Division 15. Division 16 to install VFD in mezzanine and <br /> connect complete. <br /> END OF ADDENDUM#1 <br /> Page 3 of 3 <br />