My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Locate piping muouts as close as possible to bottom of floor slab supporting fixtures or drains. <br /> 3.10 FIELD QUALITY CONTROL <br /> A. Inspections: <br /> 1. Do not enclose, cover, or put into operation drainage and vent piping system until it has been inspected and <br /> approved by the authority having jurisdiction. <br /> 2. During the progress of the installation,notify the plumbing official having jurisdiction,at least 24 hours prior <br /> to the time such inspection must be made. Perform tests specified below in the presence of the Minnesota <br /> plumbing official. <br /> a. Rough-in Inspection: Arrange for inspection of the piping system before concealed or closed-in after <br /> system is roughed-in,and prior to setting fixtures. <br /> b. Final Inspection: Arrange for a final inspection by the plumbing official to observe the tests specified <br /> below and to insure compliance with the requirements of the Minnesota Plumbing Code. <br /> 3. Reinspection: Whenever the piping system fails to pass the test or inspection,make the required corrections, <br /> and arrange for reinspected by the plumbing official. <br /> 4. Reports: Prepare inspection reports,signed by the plumbing official. <br /> B. Piping System Test: <br /> 1. Test for leaks and defects all new drainage and vent piping systems and parts of existing systems,which have <br /> been altered,extended or repaired. If testing is performed in segments,submit a separate report for each test, <br /> complete with a diagram of the portion of the system tested. <br /> 2. Leave uncovered and unconcealed all new,altered,extended,or replaced drainage and vent piping until it has <br /> been tested and approved. Expose all such work for testing,that has been covered or concealed before it has <br /> been tested and approved. <br /> 3. Drainage and Venting System Testing Procedures: <br /> a. Rough Plumbing: Except for outside leaders and perforated or open jointed drain tile,test the piping of <br /> plumbing drainage and venting systems upon completion of the rough piping installation. Tightly close <br /> all openings in the piping system, and fill with water to the point of overflow,but not less than 10 feet <br /> head of water. Water level shall not drop during the period from 15 minutes before the inspection starts <br /> through completion of the inspection. Inspect all joints for leaks. <br /> b. Finished Plumbing: After the plumbing fixtures have been set and their traps filled with water, their <br /> connection shall be tested and proved gas and water-tight. Plug the stack openings on the roof and <br /> building drain where it leaves the building, and introduce air into the system equal to a pressure of V <br /> ' water column., Use a "U" tube or manometer inserted in the trap of a water closet to measure this <br /> pressure. Air pressure shall remain constant without the introduction of additional air throughout the <br /> period of inspection. Inspect all plumbing fixture connection for gas and water leaks. <br /> 4. Repair all leaks and defects using new materials and re-test system or portion thereof until satisfactory results <br /> are obtained. <br /> 5. Prepare reports for all tests and required corrective action. <br /> 15412-7 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.