Laserfiche WebLink
3.10 DEMOLITION <br /> A. Provide all labor and materials necessary for the proper completion of all items for demolition work as shown on the <br /> project Drawings and as specified within. <br /> B. All materials and equipment, including sheet metal-and piping which is noted to be removed and not reused, shall <br /> become the property of the Contractor unless otherwise noted. Disposition of such equipment shall be under the <br /> direction of the Contractor. <br /> C. Demolition work shall include, but not necessarily be limited to, removal of equipment, ductwork, piping and <br /> related accessories as shown on the Drawings. Items that become a dead service or existing equipment not required <br /> or essential to the successful completion and operation of the building under the terms established by the <br /> accompanying Specifications and Drawings shall be removed. Material and equipment must be noted on the plans <br /> "To be Abandoned"in order to leave in place. <br /> D. Salvable materials designated to remain the property of the Owner shall be carefully removed by the applicable <br /> trades,protected from damage,and stored as directed on the site until removed by the Owner. Such items to remain <br /> the property of the Owner shall be noted on the Drawings and/or properly identified by the Owner with red tags at <br /> least seven('n days prior to receipt of bids. All other salvable materials shall be the property of the Contractor. <br /> Such materials shall not be stored on the site. <br /> E. Any disruption or damage to existing condition of equipment not designated to be removed during demolition or <br /> remodeling phases shall be repaired or replaced at this Contractor's expense. <br /> END OF SECTION 15010 <br /> 15010-6 No.99132-CP2 <br />