My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.14 PIPE SLEEVES <br /> A. Exterior Wall Penetrations. Seal pipe penetrations through walls using sleeves and mechanical sleeve seals. <br /> B. Interior Miscellaneous Penetration. Provide schedule 40 pipe sleeves through walls, floors, partitions or ceilings. <br /> Seal sleeves with special sealers and materials as prescribed in Division 7. <br /> C. Provide 20 gauge galvanized sheetmetal sleeves at all non-rated duct penetrations of walls and ceilings. Seal with <br /> special sealers and materials as prescribed in Division 7. <br /> D. Extend pipe sleeves in floors 2"above finished floors in unfinished areas and 1/4"above finished floors in finished <br /> areas. <br /> 3.15 TEMPORARY HEAT/EQUIPMENT OPERATION <br /> A. Temporary Air Handling Equipment Operation: <br /> 1. Manually operate air handling systems to provide suitable environment for installation of interior finishes. <br /> Perform commissioning operations prior to starting units. Follow commissioning starting procedures and the <br /> following manual operation sequence: <br /> a. Open outdoor air dampers, close return air dampers, open all air terminals to full open. Install filters, <br /> heating coil operating (outdoor air temperatures below 40° F), condensate drain functioning, and <br /> electrical protection devices installed. Start fan, monitor indoor and outdoor conditions, and operate <br /> heating and cooling systems to control space conditions; shut down systems completely and close <br /> outdoor air dampers at end of each work day. Retum/exhaust fans shall not run during temporary <br /> operation. <br /> B. Temporary Boiler Operation: , <br /> 1. The boiler and building heating system shall not be used for temporary heat in the building. The existing <br /> heating plant may be used prior to substantial completion only with written approval from the Owner. <br /> 3.16 FIRESTOPPING <br /> A. Provide firestoppmg material for penetrations and sleeves that pass through walls and floors. Provide the <br /> firestopping material that matches the fire rating of the wall or floor. <br /> B. Conform to the requirements of Section 07240"Firestopping". <br /> END OF SECTION 15050 <br /> i <br /> 15050-8 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.