My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Moisture Control <br /> 5. Cold Weather Protection <br /> B. Trenching: Excavate trenches for mechanical installations as follows: <br /> 1. Excavate trenches to the uniform width,sufficiently wide to provide ample working room and a minimum of 6 <br /> to 9 inches clearance on both sides of pipe and equipment. <br /> 2. Excavate trenches to depth indicated or required for piping to establish indicated slope and invert elevations. <br /> Beyond building perimeter,excavate trenches to an elevation below frost line. <br /> 3. Limit the length of open trench to that in which pipe can be installed,tested,and the trench backfilled within <br /> the same day. <br /> 4. Where rock is encountered, carry excavation below required elevation and backfill with a layer of crushed <br /> stone or gravel prior to installation of pipe. Provide a minimum of 6 inches of stone or gravel cushion <br /> between rock bearing surface and pipe. <br /> 5. Excavation trenches for piping and equipment with bottoms of trench to accurate elevations for support of pipe <br /> and equipment on undisturbed soil. <br /> a. For pipes 6 inches or larger in nominal size,shape bottom of trench to fit bottom%<of the circumference. <br /> Fill unevenness with tamped sand backfill. At each pipe joint over-excavate to relieve the bell or pipe <br /> joint of the pipe of loads,and to ensure continuous bearing of the pipe barrel on the bearing surface. <br /> C. Subsidence: Where subsidence occurs at mechanical installation excavations during the period 12 months after <br /> Substantial Completion, remove surface treatment (i.e., pavement, lawn, or other finish), add backfill material, <br /> compact to specified conditions, and replace surface treatment. Restore appearance, quality, and condition or <br /> surface or finish to match adjacent areas. <br /> 3.03 ERECTION OF METAL SUPPORTS AND ANCHORAGE <br /> A. Cut, fit,and place miscellaneous metal fabrications accurately in location,alignment, and elevation to support and <br /> anchor mechanical materials and equipment. <br /> B. Field Welding: Comply with AWS"Structural Welding Code." <br /> 3.04 ERECTION OF WOOD SUPPORTS AND ANCHORAGE <br /> A. Cut,fit,and place wood grounds,nailers,blocking, and anchorage accurately in location,alignment, and elevation <br /> to support and anchor mechanical materials and equipment. <br /> B. Select fastener sizes that will not penetrate members where opposite side will be exposed to view or will receive <br /> finish materials. Make tight connections between members. Install fasteners without splitting wood members. <br /> C. Attach to substrates as required to support applied loads. <br /> D. Wood shall be fire treated and pressure treated to prevent absorption of moisture. <br /> 150504 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.