My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.05 PROJECT CONDITIONS <br /> A. Conditions Affecting Excavations: The following project conditions apply: <br /> 1. Site Information: Subsurface conditions were investigated during the design of the Project. Reports of these <br /> investigations are available for information only; data in the reports are not intended as representations or <br /> warranties of accuracy of continuity of conditions. The Owner will not be responsible for interpretations or <br /> conclusions drawn from this information. <br /> 1.06 SEQUENCE AND SCHEDULING <br /> A. Coordinate the size and location of concrete pads. Provide templates for layout and location of anchor bolt inserts <br /> cast into pad. <br /> B. Coordinate the installation of pipe sleeves for floor and wall foundation wall penetrations. <br /> C. Coordinate the size and location of structural steel support members with ductwork, HVAC equipment, heating, <br /> cooling and plumbing piping. <br /> PART 2: PRODUCTS <br /> 2.01 MISCELLANEOUS METALS <br /> A. Steel plates,shapes,bars,and bar grating: ASTM A 36. <br /> B. Cold-Formed Steel Tubing: ASTM A 500. <br /> C. Hot-Rolled Steel Tubing: ASTM A 501. <br /> D. Steel Pipe: ASTM A 53,Schedule 40,welded. <br /> E. Nonsluink, Nonmetallic Grout: Premixed, factory-packaged, nonstaining, noncorrosive, nongaseous grout, <br /> recommended for interior and exterior applications. <br /> F. Fasteners: Zinc-coated,type,grade,and class as required. <br /> PART 3: EXECUTION <br /> 3.01 EXAMINATION <br /> A. Examine substrates, areas, and conditions,with Installer present, for compliance with requirements for installation <br /> tolerances and other conditions affecting installation. Do not proceed with installation until unsatisfactory <br /> conditions have been corrected. <br /> 3.02 EXCAVATION <br /> A. General: Refer to Division 2 Section"Earthwork" for excavation methods and the following list of soils handling <br /> techniques: <br /> 1. Shoring and Bracing <br /> 2. Materials Stockpiling <br /> 3. Backfilling and Compaction <br /> 15050-3 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.