My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 15854 <br /> CENTRAL-STATION AIR HANDLING UNITS <br /> PART 1: GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. Requirements of the following Division 15 sections apply to this section: <br /> 1. Section 15010 Basic Mechanical Requirements. <br /> 2. Section 15050 Basic Mechanical Materials and Methods. <br /> 3. Section 15030 Electrical Requirements for Mechanical Equipment. <br /> 1.02 SUMMARY <br /> A. This Section includes constant-volume and variable volume, central-station air-handling units with coils for indoor <br /> installations. <br /> B. Related Sections: The following Sections contain requirements that relate to this section: <br /> 1. Division 15 Section 15250"Mechanical Insulation"for field-applied equipment insulation. <br /> 2. Division 16 Section"Circuit and MotorDisconnects"for field-installed disconnect switches. <br /> ' 3. Division 16 <br /> Section Motor Controllers' for field-mounted alternating-current starters. <br /> 4. Division 16 Section "Motor Control Centers" for motor control centers that are used for centralizing or <br /> grouping controls in building projects. <br /> 1.03 SUBMITTALS <br /> ` A. General: Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. <br /> 1. Product data for each central-station air-handling unit indicated,including the following: <br /> a. Certified fan performance curves with system operating conditions indicated. <br /> b. Certified fan sound power ratings. <br /> c. Certified coil performance ratings with system operating conditions indicated. <br /> d. Motor ratings and electrical characteristics plus motor and fan accessories. <br /> e. Materials gages and finishes. <br /> f. Filters with performance characteristics. <br /> g. Dampers,including housings,linkages,and operators. <br /> 2. Shop drawings from manufacturer detailing dimensions, required clearances, components, and location and <br /> size of each field connection. <br /> 3. Wiring diagrams detailing wiring for power and controls and differentiating between manufacturer-installed <br /> wiring and field-installed wiring. <br /> 4. Product certificates signed by manufacturers of central-station air-handling units certifying that their products <br /> comply with specified requirements. <br /> 15854-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.