My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 15670 <br /> CONDENSING UNITS <br /> PART 1: GENERAL <br /> ' 1.01 RELATED DOCUMENTS <br /> A. Division 15 Section 15050"Basic Mechanical Materials and Methods"sections apply to work of this section. <br /> ' 1.02 SUD'IIVIARY <br /> A. Section includes: <br /> ' 1. Air-cooled condensing units. <br /> B. Related Sections: <br /> 1. Section 15030-Electrical Requirements for Mechanical Equipment <br /> 2. Section 15530-Refrigerant Piping <br /> ' 3. Section 16142-Electrical Connections for Equipment <br /> 1.03 SUBMITTALS <br /> ' A. Product Data: Submit manufacturer's technical product data, including rated capacities of selected model clearly <br /> indicated,weights(shipping,installed,and operating),dimensions,required clearances,and methods of assembly of <br /> components,furnished specialties and accessories;and installation and start-up instructions. <br /> B. Wiring Diagrams: Submit ladder-type wiring diagrams for power and control wiring required for final installation <br /> of condensing units and controls. Clearly differentiate between portions of wiring that are factory-installed and <br /> ' portions to be field-installed. <br /> C. Operation and Maintenance Data: Submit maintenance data and parts list for each condensing unit, control, and <br /> accessory; including "trouble shooting" maintenance guide; plus servicing, and preventative maintenance <br /> ' procedures and schedule. Include this data and product data in maintenance manual; in accordance with <br /> requirements of Division 1. <br /> ' 1.04 QUALITY ASSURANCE <br /> A. Codes and Standards: <br /> 1. Capacity ratings for condensing units shall be in accordance with (ARI) Standard 360 "Standard for <br /> Commercial and Industrial Unitary Air-Conditioning Equipment". <br /> 2. Refrigeration system of condensing units shall be constructed in accordance with ASHRAE Standard <br /> ASHRAE 15"Safety Code for Mechanical Refrigeration". <br /> 3. Condensing units shall meet or exceed the minimum COP/Efficiency levels as prescribed in ASHRAE 90.1 <br /> "Energy Conservation in New Building Design". <br /> 4. Construction and testing of water cooled condensing units shall be in accordance with ASME Boiler and <br /> ' Pressure Vessel Code,Section VIII. <br /> 5. Condensing units shall be listed by UL and have UL label affixed. <br /> ' 15670-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.