My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Subject to compliance with requirements,provide plumbing fixture supports from one of the following: <br /> 1. Josam Mfg.Co. <br /> 2. Smith(Jay R.)Mfg.Co. <br /> 3. Wade;Subs of Tyler Pipe Corp. <br /> 4. Zum Industries;Hydromechanics Division <br /> 2.07 EXTRA MATERIALS <br /> A. Deliver extra materials to Owner. Furnish extra materials described below matching products installed, packaged <br /> with protective covering for storage, and identified with labels clearly describing contents. Minimum of one unit <br /> each. <br /> 1. Faucet Washers and O-rings: Furnish quantity of identical units not less than 10 percent of amount of each <br /> installed. <br /> 2. Faucet Cartridges and O-rings: Furnish quantity of identical units not less than 5 percent of amount of each <br /> installed. <br /> 3. Flushometer Repair Kits: Furnish quantity of identical units not less than 10 percent of amount of each <br /> flushometer installed. <br /> 4. Provide a hinged-top wood or metal box, or individual metal boxes,having a separate compartment for each <br /> type and size of above extra materials. <br /> 5. Toilet Seats: Furnish quantity of identical units not less than 5 percent of amount of each type toilet seat <br /> installed,minimum of one seat. <br /> PART 3: EXECUTION <br /> 3.01 EXAAHNATION <br /> A. Examine roughing-in for potable cold water and hot water supplies and soil, waste, and vent piping systems to <br /> verify actual locations of piping connections prior to installing fixtures. <br /> B. Examine walls,floors,and cabinets for suitable conditions where fixtures are to be installed. <br /> C. Do not proceed until unsatisfactory conditions have been corrected. <br /> 3.02 APPLICATION <br /> A. Install plumbing fixtures and specified components, in accordance with designations and locations indicated on 1 <br /> Drawings. <br /> B. Install supports for plumbing fixtures in accordance with categories indicated,and of type required: <br /> 1. Carriers for following fixtures: <br /> a. Wall-hanging water closets. <br /> b. Wall-hanging fixtures supported from wall construction. <br /> 2. Chair carriers for the following fixtures: <br /> a. Wall-hanging urinals. <br /> b. Wall-hanging lavatories and sinks. <br /> c. Wall-hanging drinking fountains and electric water coolers. <br /> 154404 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.