My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01720-PROJECT RECORD <br /> DOCUMENTS <br /> 7. Preparation of Transparencies: Immediately prior to inspection for <br /> Certification of Substantial Completion, review completed marked-up <br /> record Drawings with the Architect. When authorized,prepare a full set of <br /> corrected transparencies of Contract Drawings and Shop Drawings. <br /> a. Incorporate changes and additional information previously marked on <br /> print sets. Erase, redraw, and add details and notations where <br /> applicable. Identify and date each Drawing; include the printed <br /> designation "PROJECT RECORD DRAWINGS" in a prominent <br /> location on each Drawing. <br /> b. Refer instances of uncertainty to the Construction Manager for <br /> resolution. <br /> c. One set of transparencies of original Contract Drawings will be <br /> furnished to the Contractor by the Owner for use in recording changes <br /> and additional information. Other printing as required is the <br /> Contractor's responsibility. <br /> d. The Contractor is responsible for printing original Contract Drawings <br /> and other Drawings as required to produce transparencies. The <br /> Architect will make original Contract Drawings available to the , <br /> Contractor's print shop. <br /> e. Copies and Distribution: After completing the preparation of <br /> transparency record drawings, print 3 blue-line or black-line prints of <br /> each Drawing, whether or not changes and additional information were <br /> recorded. Organize the copies into manageable sets. Bind each set <br /> with durable paper cover sheets, with appropriate identification, <br /> including titles, dates and other information on cover sheets. <br /> (1) Organize and bind original marked-up set of prints that were <br /> maintained during the construction period in the same manner. <br /> ( ) Organize anize record transparencies into sets matching the print sets. <br /> g P <br /> Place these sets in durable tube-type Drawing containers with <br /> end caps. Mark the end cap of each container with suitable <br /> identification. <br /> (3) Submit the marked-up record set, transparencies, and 3 copy sets <br /> to the Architect for Owner's records; the Architect will retain one <br /> copy set. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01720-3 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.