My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01720-PROJECT RECORD <br /> DOCUMENTS <br /> 1. GENERAL <br /> A. This section covers the furnishing of all labor, materials, tools,equipment, and <br /> performing all work and services to provide record documents as specked, in <br /> accordance with the provisions of the Contract Documents, and completely <br /> coordinated with work of all other trades. <br /> B. This Section specifies administrative and procedural requirements for Project <br /> Record Documents. <br /> I1. Project Record Documents required include: <br /> a. Marked-up copies of Contract Drawings. <br /> b. Marked-up copies of Shop Drawings. <br /> c. Newly prepared Drawings. <br /> d. Marked-up copies of Specifications, addenda and Change Orders. <br /> e. Marked-up Product Data submittals. <br /> f. Record Samples. <br /> g. Field records for variable and concealed conditions. <br /> h. Record information on Work that is recorded only schematically. <br /> 2. Maintenance of Documents and Samples: Store record documents and <br /> Samples in the field office apart from Contract Documents used for <br /> construction. Do not permit Project Record Documents to be used for <br /> construction purposes. Maintain record documents in good order, and in a <br /> clean, dry, legible condition. Make documents and Samples available at <br /> all times for inspection by the Architect. <br /> C. Related work specified elsewhere: <br /> 1. Section 01700 - Project Closeout, includes general project closeout <br /> requirements.. <br /> 2. Section 01300 - Submittals, includes general requirements for submittal of <br /> Project Record Documents. <br /> 2. RECORD DRAWINGS <br /> A. Mark-up Procedure: During the construction period,maintain a set of blue- or <br /> black-line white-prints of Contract Drawings and Shop Drawings for Project <br /> Record Document purposes. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01720- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.