DIVISION 1 <br /> CONDITIONS OF THE CONTRACT <br /> 01300-SUBMITTALS <br /> 1. GENERAL <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and Division 1 Specification Sections apply to this <br /> Section. <br /> B. This Section defines procedures for the following submittals required by the <br /> Contract Documents. <br /> 2. SCHEDULE OF SUBMI'I°TALS -REQUIRED <br /> A. The following documents are required to be submitted to the Architect and/or <br /> Construction Manager for review at the times indicated. <br /> 1. Prior to Bidding(Ten days prior to bid opening): <br /> Request for approval of substitute material and equipment. <br /> 2. Within 10 days of Contract approval by Owner: <br /> Performance and Payment Bonds <br /> Insurance evidence <br /> List of materials and equipment <br /> List of subcontractors <br /> 3. Within 10 days of signing Contracts: <br /> Schedule of Values (based on specification sections) <br /> ' 4. During Progress of Project as specified: <br /> Shop drawings <br /> Samples <br /> Test.results. <br /> Payment requests <br /> 5. Upon Substantial Completion: <br /> Equipment and material guarantees <br /> Operations manuals <br /> As-built drawing notes <br /> Final payment request accompanied by: <br /> Certificate of Payment of Claims <br /> Withholding Tax Affidavit <br /> Consent of Surety to Final Payment <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01300- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />