My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> CONDITIONS OF THE CONTRACT <br /> 01300-SUBMITTALS <br /> 1. GENERAL <br /> A. Drawings and general provisions of the Contract, including General and <br /> Supplementary Conditions and Division 1 Specification Sections apply to this <br /> Section. <br /> B. This Section defines procedures for the following submittals required by the <br /> Contract Documents. <br /> 2. SCHEDULE OF SUBMI'I°TALS -REQUIRED <br /> A. The following documents are required to be submitted to the Architect and/or <br /> Construction Manager for review at the times indicated. <br /> 1. Prior to Bidding(Ten days prior to bid opening): <br /> Request for approval of substitute material and equipment. <br /> 2. Within 10 days of Contract approval by Owner: <br /> Performance and Payment Bonds <br /> Insurance evidence <br /> List of materials and equipment <br /> List of subcontractors <br /> 3. Within 10 days of signing Contracts: <br /> Schedule of Values (based on specification sections) <br /> ' 4. During Progress of Project as specified: <br /> Shop drawings <br /> Samples <br /> Test.results. <br /> Payment requests <br /> 5. Upon Substantial Completion: <br /> Equipment and material guarantees <br /> Operations manuals <br /> As-built drawing notes <br /> Final payment request accompanied by: <br /> Certificate of Payment of Claims <br /> Withholding Tax Affidavit <br /> Consent of Surety to Final Payment <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01300- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.