My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01041 -SCHEDULES <br /> GENERAL <br /> 1. RELATED DOCUMENTS <br /> Drawings and general provisions of Contract, including General Conditions and <br /> Division 1 Specifications, apply to work of this Section. <br /> 2. COORDINATION <br /> A. The Contractor shall coordinate scheduling with the Construction Manager. <br /> In particular, the Contractor shall provide close coordination of progress <br /> schedule, schedule of values, listing of subcontractors, schedule of submittals, <br /> progress reports and payment requests. <br /> B. Close coordination will be required between all construction trades in order <br /> that individual areas of construction can be completed by their scheduled time. <br /> Consult the proposed construction sequence schedule for start and completion <br /> dates of individual work areas. <br /> 3. PRELI IINARY SCHEDULE <br /> A. The Construction Manager has developed a Preliminary Schedule included at <br /> the end of this section, showing work areas of the project which directly <br /> impact the orderly use of the facility during construction. The timing of these <br /> activities has been approved by the Owner. <br /> B. The PreliminarySchedule may not list the work completely and may vary <br /> Y <br /> from the drawings and specifications. <br /> 4. C ONSTRUCTION SCHEDULE <br /> A. The Construction Manager shall computerize a Precedence Diagram Method <br /> (PDM)- Network" using data supplied by- the, Contractor` and all <br /> subcontractor(s). The Contractor will be responsible for his own methods and <br /> procedures and the performance of the work consistent with good practice. <br /> B. Neither the Construction Manager nor the Owner warrants the information <br /> supplied by the Contractors is accurate or correct or that the project can be <br /> performed as scheduled based upon data supplied by the Contractors. <br /> C. The Contractor shall be responsible for providing all data to develop and <br /> update the schedule. The Contractor shall supervise all work activities to <br /> maintain progress in accordance with the schedule. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01041 - 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.