My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> 15.5.2 The Contractor shall request "interpretations from the Architect, through the <br /> Construction Manager" to "interpretations from the Construction Manager" for <br /> the following: Work indicated on the Drawings or specified in such a manner as <br /> to make it impossible to produce Work of the highest quality within the space <br /> shown; possibilities of damaging effects of expansion and contraction; <br /> discrepancies found between Drawings or between Drawings and <br /> Specifications. If the Contractor does not request such interpretation, no excuse <br /> will be entertained thereafter for failure to carry out and guarantee the Work in a <br /> satisfactory manner. Elements of the Work intended to protect against the <br /> weather shall be guaranteed weatherproof and watertight. <br /> 15.5.3 Proper performance of the Contract shall imply correct and proper placement, <br /> proper or published results for products and equipment, fitting and operation of <br /> fixed or movable and operating parts of the Work, including doors, windows, <br /> hardware and all systems and equipment. Materials and equipment shall be <br /> completed in every respect, with parts, connections, anchors, devices, backing, <br /> fittings and other necessary items, and shall be completely installed, anchored, <br /> fitted and placed in operating condition. Before buying, constructing or <br /> installing work, the Contractor shall notify the Architect of conditions which <br /> exist in the Contract Documents which will adversely affect proper operation of <br /> first quality installation. <br /> 15.5.4 Throughout the Project, accommodate various materials and pieces of r <br /> equipment that are fitted to other materials and equipment and various materials i <br /> that are applied to which other materials attach. Take all reasonable precautions <br /> to insure materials, devices, items, equipment or other products can be <br /> satisfactorily applied or installed to each other or work of others and make <br /> necessary adjustments during preparation of shop drawings or in advance of <br /> field or shop work to accommodate other work. <br /> 15.5.5 Materials or equipment shall be installed or applied according to directions of <br /> the manufacturer or recommendations of an association dealing primarily with <br /> materials, unless specifically designated otherwise. In no case shall installation, <br /> including any temporary work necessary (e.g., shoring), be below standard <br /> recommended by manufacturer. Where specified requirements exceed the <br /> manufacturer's standards, the specification shall govern. Fabrication (including <br /> reinforcing and accessories) and installation shall be provided to insure proper <br /> placement and use of the item or material under the location, use, condition, and <br /> available space to serve intended function and to meet code requirements. <br /> Equipment and devices shall be provided and installed to "fail safe" under <br /> normal operating conditions and it shall be Contractor's obligation to provide <br /> and install work in such manner. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 26 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.