My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> ' CONDITIONS OF THE CONTRACT <br /> 00800 -SUPPLEMENTARY <br /> ' CONDITIONS <br /> set forth verbatim herein. In the event of any conflict between such statutory <br /> ' provisions and the standard printed provisions of this Bond, the statutory <br /> language shall supersede and control in all respects. <br /> ' 11.4.5 Add Subparagraph: The bond shall be in the amount of 100% of the full <br /> Contract Sum. When two part bonds are provided, the bond shall be provided <br /> with 100% of the Contract Sum for the Performance Bond and 100% of the <br /> ' Contract Sum for the Payment Bond. <br /> 11.4.6 Add Subparagraph: The Bond shall guarantee the Contractor will perform each <br /> and every part of the Contract, cover all guarantees called for and insure prompt <br /> payment to all persons furnishing material or labor required in prosecution of <br /> the Work under the Contract. In the event of additions to the Contract, the <br /> ' Owner reserves the right to require evidence of additional bonding. <br /> 11.4.7 Add Subparagraph: The Bond shall provide: (1) for additions or deductions <br /> 1 from the Work in any amount; (2) that completion time shall not be extended by <br /> reason of changes in the Work, unless agreed to at time of change; (3) that no <br /> notice of aforesaid alterations, additions or omissions need to be given the <br /> Surety; and(4)permit occupancy by the Owner at any time. <br /> 11.4.8 Add Subparagraph: Final acceptance of the Work shall not relieve the <br /> ' Contractor nor Surety from their obligations under this contract, including <br /> warranties of materials, equipment, installation or service. <br /> ' 12. ARTICLE 12-UNCOVERING AND CORRECTION OF WORK <br /> 12.1 Uncovering of Work <br /> 12.1.1 Add to Subparagraph: The Contractor shall give timely notice to the Architect, <br /> through the Construction Manager, of the readiness of the work to be observed. <br /> 12.1.2 In,the second line,between,the words "the." and "Construction Manager", insert <br /> the words "Contract Documents or the--". <br /> 12.2 Correction of Work <br /> ' 12.2.1 Add at end of first sentence: "Unless the Owner elects to accept the work as <br /> provided for under paragraph 12.3". Add at the end of the subparagraph: <br /> "Work rejected before final completion shall be corrected prior to the processing <br /> 1 of the final Contractor's Application and Certificate for Payment." <br /> ' EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800-21 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.