My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2.05 GLASS <br /> A. Provide products specified in Section 08800. <br /> B. Conform to requirements of Section 08800. <br /> 2.06 FABRICATION <br /> A. Any dimensions which may vary are indicated on drawings, with maximum and minimum dimensions required to <br /> achieve design requirements and coordination with other work. Field verify all opening dimensions. <br /> ' B. Fabrication: To greatest extent possible,complete fabrication assembly,and finishing at manufacturers plant before <br /> shipment to project site. Disassemble components only as necessary for shipment and installation. <br /> ' 1. Maintain accurate relation of planes and angles,with hairline fit of contacting members. <br /> 2. Select members for fabrication so that adjacent anodized extruded aluminum members do not have color or <br /> ' texture variation greater than half the range indicated in the submitted samples. <br /> 3. Factory-install all hardware except surface-mounted items. <br /> 4. Perform fabrication operations, including cutting, fitting, forming, drilling, and grinding of metal work, in <br /> manner which prevents damage to exposed finish surfaces. <br /> ' a. For hardware,perform these operations prior to application of finishes. <br /> C. Welding: Comply with AWS recommendations to avoid discoloration; grind exposed welds smooth and restore <br /> mechanical finish. <br /> D. Reinforcing: Install reinforcing as required for hardware and as necessary for performance requirements, sag <br /> resistance,and rigidity;separate dissimilar metals as specified under"Installation." <br /> PART 3: EXECUTION <br /> 3.01 PREPARATION <br /> A. Verify and coordinate installation tolerances. <br /> B. Verify that openings are properly prepared,with blocking installed and cavities sealed. <br /> 3.02 INSTALLATION <br /> A. Comply with manufacturer's instructions and recommendations for installation of components. <br /> ' B. Install plastic flashing under all sills and sill flashing. Turn up at ends to form end dams. Set in full bed of mastic, <br /> lap flashing 4"minimum and seal. Secure to wall with keeper strip. <br /> ' C. Set units plumb,level,and true to line,without warp or rack. Provide proper support and anchor securely in place. <br /> D. Separate aluminum exposed to weather from dissimilar metals; coat dissimilar metals that are in drainage cavities <br /> using one of the materials specified. Aluminum,stainless steel,zinc,cadmium,and small areas of white bronze are <br /> not considered dissimilar from each other. <br /> E. Coat all metals that come into contact with masonry, concrete, and treated wood, using one of the materials <br /> ' specified. <br /> 08521-5 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.