My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.05 SUBMITTALS <br /> A. Shop Drawings: Submitted for approval by Architect, prior to fabrication. Indicate installation details, materials <br /> used,quantity and size required. Refer to Submittals Section to submittal requirements. <br /> B. Samples: <br /> ' 1. Color: One(1) 12 inch extrusions with specified finish,properly labeled. <br /> 2. Glass: One(1) 12 inch square samples of each glass type indicated,properly labeled. <br /> ' C. Letter from manufacturer approving contractor to install windows. <br /> D. Test reports showing compliance with performance requirements. <br /> E. Warranty: Submit per Section 1730. <br /> 1.06 PROJECT CONDITIONS <br /> A. Check actual unit opening by accurate field measurement before fabrication. Coordinate fabrication schedule with <br /> construction progress to avoid delay of work. <br /> 1.07 QUALITY ASSURANCE <br /> ' A. Manufacturer to be fully responsible for engineering fabrication and overseeing installation to insure a weathertight <br /> installation. <br /> ' B. Installer Qualifications: Authorized representative of the manufacturer,with not less than five(5)years experience <br /> in the fabrication and installation of products similar to those specified under this Section. <br /> C. Warranty: <br /> 1. Fabricated products: Manufacturer to provide written warranty agreeing to repair or replace product that fail <br /> in materials or factory workmanship within ten(10)years from the date of Substantial Completion. <br /> 2. Glass: Provide written warranty of thermal and physical integrity of insulating glass units for ten (10)years <br /> from date of Substantial Completion. <br /> PART 2: PRODUCTS <br /> 2.01 MANUFACTURERS <br /> A. The following manufacturers/products are approved as noted below with the understanding they will meet the actual <br /> products specified. <br /> Manufacturer Windows Storefront/Entrances Curtainwall <br /> Arch-Amarlite ■ ■ <br /> CMI ■ ■ <br /> Empirehouse ■ <br /> ' EFCO ■ ■ ■ <br /> Moduline ■ ■ <br /> Tubecraft ■ <br /> Tubelite ■ ■ <br /> ' Wausau ■ ■ ■ <br /> ' 08521-3 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.