My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 FACTORY FINISHING <br /> A. General: comply with applicable requirements of AWI Quality Standards, Section 1500,for types of finish systems <br /> indicated. <br /> B. Transparent Finish: <br /> ' 1. Type: Factory finish to be water-based stain and ultraviolet(UV) cured polyurethane sealer to comply with <br /> EPA Title 5 guidelines for Volatile Organic Compound (VOC) emissions limitations. Finish must meet or <br /> exceed performance standards of AWI TR-6 catalyzed polyurethane. <br /> 2. Stain color: See Material Finish/Color Schedule,Sections 1-4 of Details of Construction. <br /> 3. Grain effect: Closed. <br /> 4. Sheen: Satin(low luster). <br /> ' 5. Grade: Premium. <br /> PART 3: EXECUTION <br /> 3.01 INSPECTION <br /> ' A. Require installer to examine door frames after their installation, and doors prior to their hanging, for the following <br /> purposes: <br /> 1. To verify that frames comply with indicated requirements for type, size, location, and swing characteristics. <br /> and have been installed with plumb jambs and level heads. <br /> 2. To verify that doors are free of defects. <br /> B. Obtain installer's written report listing conditions detrimental to compliance with requirements of this section. <br /> C. Do not proceed with installation until unsatisfactory conditions have been corrected. <br /> 3.02 INSTALLATION <br /> A. Condition doors to average prevailing humidity in installation area prior to hanging. <br /> B. Hardware Installation: Section 08700. <br /> C. Install wood doors in accordance with manufacturer's instructions and referenced standards. <br /> 1. Installation of the wood doors,and labeled wood doors shall comply with NWWDA I.S.1-A, Installation and <br /> NFPA 80. <br /> 2. Dimensional tolerances for hardware cutouts, undercuts, meeting edges, heights and width shall comply with <br /> NWWDA I.S.1-A,G-14. <br /> D. Prefit Doors: Fit to frames and machine for hardware to whatever extent not previously worked at factory as <br /> required for fit and uniform clearance at each edge. <br /> E. Shop-Finished Doors: Restore finish on edges of shop-finished doors before installation, if fitting or machining is <br /> required at the project site. Touch up any scratched doors to satisfaction of Architect prior to substantial <br /> completion or replace doors. <br /> 08200-5 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.