My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 MATERIALS <br /> A. Provide materials classified by UL to provide firestopping equal to time rating of construction being penetrated. <br /> B. Provide asbestos free materials that comply with applicable codes and have been tested under positive pressure in <br /> accordance with UL 1479 or ASTM E 814. <br /> PART 3: EXECUTION <br /> 3.01 PREPARATION <br /> A. Clean surfaces to be in contact with penetration seal materials, of dirt, grease, oil, loose materials, rust, or other <br /> substances that may affect proper fitting,adhesion,or the required fire resistance. <br /> 3.02 INSTALLATION <br /> A. Install penetration seal materials in accordance with printed instructions of the UL Fire Resistance Directory and in <br /> accordance with manufacturer's instruction. <br /> B. Seal holes or voids made by penetrations to ensure an effective smoke barrier. <br /> C. Where floor openings without penetrating items are more than four inches in width and subject to traffic or loading, <br /> install firestopping materials capable of supporting same loading as floor. <br /> D. Protect materials from damage on surfaces subject to traffic. <br /> 3.03 FIELD QUALITY CONTROL <br /> A. Examine penetration sealed areas to ensure proper installation before concealing or enclosing areas. <br /> B. Keep areas of work accessible until inspection by applicable code authorities. <br /> C. Perform under this section patching and repairing of firestopping caused by cutting or penetration by other trades. <br /> 3.04 ADJUSTING AND CLEANING <br /> A. Clean up spills of liquid components. <br /> B. Neatly cut and trim materials as required. <br /> C. Remove equipment,materials and debris,leaving area in undamaged,clean condition. <br /> 3.05.SYSTEMS AND APPLICATION SCHEDULE <br /> Construction Condition UL Designation <br /> A. Metal Pipe or Conduit Through Round Opening CAJ 1001,CAJ7001,CAJ 1007,FB 1002, <br /> CAJ 1027,CAJ 1044,CAJ7003,WJ 1010 <br /> B. Insulated Metal Pipe Through Round Opening CAJ5001,CAJ5002,CAJ5003,CBJ5002, <br /> CBJ5003,FA1002,FA5001,FA8001, <br /> CAJ5005 <br /> 07240-2 No.99132-CP2 <br />